On the basis of the information provided by the Austrian authorities in connection with the procedure, the doubts raised by the Commission have been cleared up. Although the former installations dated from 1958, they would not have had to be replaced for production or environmental reasons if the wastewater pollution standards had not been changed. They could have continued to operate without any time limit. The investments had to be carried out purely because the old system was not able to meet the new environmental protection standards on wastewater. The main elements of the old system, the three basins, have been integrated into the new system. The Commission therefore concludes that the investments were carried out purely for environmental reasons and with a view to meeting the new standards.