Forges de Clabecq is an integrated steel plant which produces liquid steel and finished flat products, namely sheet and flattened slabs. In 1995/96, it produced 725 000 tonnes of cast iron, 710 000 tonnes of steel (slabs) and 504 000 tonnes of sheet and flattened slabs. Annual production capacity is 1 250 000 tonnes of cast iron, 1 500 000 tonnes of steel and 980 000 tonnes of hot-rolled sheet. Monthly turnover is in the order of Bfrs 900 million. The workforce stood at 2 145 employees on 31 January 1996.
In June 1996, the undertaking had capital resources of Bfrs 51 million and financial debts of Bfrs 3 443 million, together with other debts (commercial, social and tax debts) totalling Bfrs 1 997 million.
After having studied various possibilities regarding the future of the undertaking the Region of Wallonia, through SWS, decided to take control of Forges de Clabecq and drew up a recovery plan for the undertaking, accompanied by a number of conditions. Before restructuring, the authorized capital of the undertaking was Bfrs 3 080 million, broken down as follows: SWS, 39 %; Socindus (private), 21,3 %; and the general public through stock exchange quotations, the remainder (nearly 40 %). Since 17 June 1996, the Belgian State, through SWS, has held 60,4 % of the shares.
After having considered various scenarios, the Region of Wallonia decided to maintain Forges de Clabecq as an integrated steel plant, while at the same time refocusing on a limited range of products for which the undertaking was in a more advantageous position. This option was taken against the advice of an independent expert who had come to the conclusion that Forges de Clabecq could survive in its existing industrial structure only if its capital was increased by Bfrs 4 500 million and that, in any event, it could possibly survive in that structure for five years at the most.
Total production would be limited in volume to 550 000 tonnes of hot-rolled sheet and 790 000 tonnes of slabs (including 150 000 tonnes for sale). Excess output from the liquid stage, and at least 200 000 tonnes, had to be disposed of externally, the Boël group having undertaken to continue to take the same tonnage as in recent years.
A social contract was signed with the employees in June 1996. The workforce was to be cut by 700 in the period up to June 1998. Most of the shedding of the workforce (560) was to be through early retirement and only 140 jobs were to be lost through redundancies/voluntary departures.