…
Sample Mixing, The Seed (Registration, Licensing and Enforcement) (Wales) Regulations 2005 (revoked)
In forcesince 27 Feb 2012
Changed on 27 Feb 2012
(c) an empty pan shall be placed on each side of the divider to receive the discharge from the chutes;
(d) the entire composite sample shall be poured evenly into the other pan(s);
(e) the seed shall then be poured from the pan(s) evenly along the entire length of the hopper;
(f) the two pans into which the seed has passed shall then be replaced with empty pans;
(g) procedures (e) and (f) shall then be repeated twice to mix the sample thoroughly;…
- 27 Feb 2012 – todayin force
- 18 Nov 2005 – 27 Feb 2012earlier wording