The Rampion 2 Offshore Wind Farm Order 2025
Typestatutory instrumentDate4 Apr 2025Articles316Versions held2Cited by16 documentsLast changed24 Apr 2026
- 22Compulsory acquisition of land
- 23Time limit for exercise of authority to acquire land compulsorily or to take land temporarily
- 24Compulsory acquisition of rights and imposition of restrictive covenants
- 25Private rights over land
- 26Power to override easements and other rights
- 27Application of the 1981 Act
- 28Modification of Part 1 of the 1965 Act
- 29Acquisition of subsoil or airspace only
- 30Rights under or over streets
- 31Temporary use of land for carrying out the authorised project
- 32Temporary use of land for maintaining the authorised project
- 33Compulsory acquisition of land – incorporation of the mineral code
- 34Statutory undertakers
- 35Apparatus and rights of statutory undertakers in closed streets
- 36Recovery of costs of new connections
- 37Special Category Land
- 40Application of landlord and tenant law
- 41Operational land for purposes of the 1990 Act
- 42Felling or lopping of trees and removal of hedgerows
- 43Trees subject to tree preservation orders
- 44Abatement of works abandoned or decayed
- 45Procedure in relation to certain approvals etc.
- 46Arbitration
- 47Saving provisions for Trinity House
- 48Crown rights
- 49Certification of plans and documents, etc.
- 50Protective provisions
- 51Funding
- 52No double recovery
- 53Disregard of certain improvements, etc
- 54Set-off for enhancement in value of retained land
- 55Service of notices
- 56Compensation measures
- 1Time limits
- 2Detailed offshore design parameters
- 3
- 4
- 5
- 6Cable parameters
- 7Onshore substation parameters
- 8Site-specific plan for the detailed design approval of the onshore substation at Oakendene
- 9Detailed design approval – extension to National Grid substation
- 10Stages of onshore works
- 11Offshore Decommissioning
- 12Provision of landscaping
- 13Implementation and maintenance of landscaping
- 14Biodiversity net gain
- 15Highway accesses outside the South Downs National Park
- 16Highway accesses in the South Downs National Park
- 17Operational drainage management
- 18
- 19Onshore Archaeology
- 20Public rights of way
- 21Open access land
- 22Code of construction practice
- 23Onshore construction method statement
- 24Construction traffic management plan
- 25Contamination risk
- 26Coastal erosion
- 27Operation phase maintenance
- 28
- 29Control of noise during operational phase
- 30Control of artificial light emissions during operational phase
- 31
- 32Operational Travel Plan
- 33Skills and Employment Strategy
- 34Construction Communication Plan
- 35Onshore decommissioning
- 36Primary Surveillance Radar Mitigation
- 37Instrument flight procedures
- 38Vegetation retention and removal
- 39Horsham District mitigation and enhancement
- 40Public rights of way and landscape enhancement
- 41National Park enhancement and furtherance
- 42European protected species licence
- 43Site-specific plan for the detailed design approval of the temporary construction compounds at Washington a
- 44Crossing Schedule
- 45Requirement for written approval
- 46Amendments to approved details
- Schedule 2 STREETS SUBJECT TO STREET WORKS
- Schedule 3 STREETS TO BE TEMPORARILY CLOSED
- Schedule 4 PUBLIC RIGHTS OF WAY
- Schedule 5 ACCESS TO WORKS
- Schedule 6 TEMPORARY SUSPENSION OF PUBLIC ACCESS TO ACCESS LAND
- Schedule 7 ACQUISITION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS ONLY
1 PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
2 PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
3 FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER
- 1Application
- 2Interpretation
- 3Apparatus of National Grid in closed streets
- 4Protective works to buildings
- 5Acquisition of land
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus: protection
- 9Expenses
- 10Indemnity
- 11Enactments and agreements
- 12Co-operation
- 13Access
- 14Arbitration
- 15Notices
4 FOR THE PROTECTION OF SOUTHERN ELECTRIC POWER DISTRIBUTION PLC AS ELECTRICITY UNDERTAKER
- 1Application
- 2Interpretation
- 3On Street apparatus
- 4Apparatus of SSE in temporarily closed streets
- 5Protective works to buildings
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus: protection of SSE
- 9Retained apparatus: protection of SSE as electricity undertaker – overhead lines
- 10Expenses
- 11Enactments and agreements
- 12Co-operation
- 13Access
- 14Arbitration
- 15Notices
5 FOR THE PROTECTION OF SOUTHERN GAS NETWORKS PLC AS GAS UNDERTAKER
- 1Application
- 2Interpretation
- 3On street apparatus
- 4Apparatus of SGN in temporarily closed streets
- 5Protective works to buildings
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus: protection of SGN
- 9Expenses
- 10Enactments and agreements
- 11Co-operation
- 12Access
- 13Arbitration
- 14Notices
6 FOR THE PROTECTION OF RAILWAY INTERESTS
7 FOR THE PROTECTION OF NATIONAL HIGHWAYS LIMITED
- 1Application etc
- 2Interpretation
- 3General
- 4
- 5
- 6Works outside the Order limits
- 7Prior approvals and security
- 8Construction of the specified works
- 9Payments
- 10Provisional Certificate
- 11Opening
- 12Final condition survey
- 13Defects Period
- 14Final Certificate
- 15Security
- 16Insurance
- 17Indemnity
- 18Maintenance of the specified works
- 19Land
- 20Expert Determination
- 1Design parameters
- 2
- 3Maintenance of the authorised scheme
- 4Extension of time periods
- 5Notifications and inspection
- 6Aids to navigation
- 7Colour of structures
- 8Aviation safety
- 9Chemicals, drilling and debris
- 10Force majeure
- 11Pre-construction plans and documentation
- 12
- 13Safety Zones
- 14Offshore safety management
- 15Reporting of engaged agents, contractors and vessels
- 16Pre-construction monitoring and surveys
- 17Construction monitoring
- 18Post-construction monitoring
- 19Monitoring of underwater noise from piling
- 20Timing of monitoring report
- 21Updating of cable monitoring plan
- 22Piling
- 23Reporting of cable protection
- 24Decommissioning
- 25Completion of construction
- 26Herring piling restriction
- 27Reporting of impact pile driving
- 28Piling restriction
- 1Design parameters
- 2
- 3Maintenance of the authorised project
- 4Extension of time periods
- 5Notifications and inspections
- 6Aids to navigation
- 7Colour of structures
- 8Aviation safety
- 9Chemicals, drilling and debris
- 10Force majeure
- 11Pre-construction plans and documentation
- 12
- 13Safety Zones
- 14Offshore safety management
- 15Reporting of engaged agents, contractors and vessels
- 16Pre-construction monitoring and surveys
- 17Construction monitoring
- 18Post-construction monitoring
- 19Monitoring of underwater noise from piling
- 20Timing of monitoring report
- 21Updating of cable monitoring plan
- 22Piling
- 23Reporting of cable protection
- 24Decommissioning
- 25Completion of construction
- 26Herring piling restriction
- 27Reporting of impact pile driving
- 28Piling restriction
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.