The A122 (Lower Thames Crossing) Development Consent Order 2025
- 9Application of the 1991 Act
- 10Construction and maintenance of new, altered or diverted streets and other structures
- 11Access to works
- 12Temporary closure, alteration, diversion and restriction of use of streets
- 13Use of private roads for construction
- 14Permanent stopping up of streets and private means of access
- 15Classification of roads, etc.
- 16Clearways, speed limits and prohibitions
- 17Traffic regulation – local roads
- 25Compulsory acquisition of land
- 26Compulsory acquisition of land – incorporation of the mineral code
- 27Time limit for exercise of authority to acquire land compulsorily
- 28Compulsory acquisition of rights and imposition of restrictive covenants
- 29Private rights over land
- 30Modification of Part 1 of the 1965 Act
- 31Application of the 1981 Act
- 32Modification of the 2017 Regulations
- 33Acquisition of subsoil or airspace only
- 34Rights under or over streets
- 35Temporary use of land for carrying out the authorised development
- 36Temporary use of land for maintaining the authorised development
- 37Statutory undertakers
- 38Apparatus and rights of statutory undertakers in stopped up streets
- 39Recovery of costs of new connections
- 40Special category land
- 41Disregard of certain improvements, etc.
- 42Set off for enhancement in value of retained land
- 43Crown rights
- 44Power to operate, use and close the tunnel area
- 45Road user charging
- 46Suspension of road user charging
- 47No apparatus in the tunnel area without consent
- 48Protection of the tunnel area, etc.
- 49Removal of vehicles
- 50Removal of obstructions
- 51Byelaws relating to the tunnel area
- 52Fixed penalty notices relating to byelaws
- 53Disapplication of legislative provisions, etc.
- 54Designation of fen land
- 55Application of local legislation, etc.
- 56Planning permission, etc.
- 57Application of landlord and tenant law
- 58Defence to proceedings in respect of statutory nuisance
- 59Protection of interests
- 60Deemed marine licence
- 61SACR
- 62Certification of documents, etc.
- 63Service of notices
- 64Arbitration
- 65Financial arrangements for the Kent Downs National Landscape
- 66Power to override easements and other rights
- 67No double recovery
- 68Interface with waste operation permits
- 1Interpretation
- 2Time limits
- 3Detailed design
- 4Construction and handover environmental management plans
- 5Landscaping and ecology
- 6Contaminated land and groundwater
- 7Protected species
- 8Surface and foul water drainage
- 9Historic environment
- 10Traffic management
- 11Construction travel plans
- 12Fencing
- 13Travellers’ site in Thurrock
- 14Traffic monitoring
- 15Interaction with Thurrock Flexible Generation Plant
- 16Carbon and energy management plan
- 17Passive provision for Tilbury link road
- 18Operation of the Orsett Cock roundabout
- 19Amendments to approved details
- 20Amendments to the control documents
2 PROCEDURE FOR DISCHARGE OF REQUIREMENTS
3 AMENDMENTS TO BE MADE TO THE CONTROL DOCUMENTS
- Schedule 3 TEMPORARY CLOSURE, ALTERATION, DIVERSION AND RESTRICTION OF USE OF STREETS AND PRIVATE MEANS OF ACC
- Schedule 4 PERMANENT STOPPING UP OF STREETS AND PRIVATE MEANS OF ACCESS
- Schedule 5 CLASSIFICATION OF ROADS, ETC.
- Schedule 6 TRAFFIC REGULATION MEASURES
- Schedule 7 TREES SUBJECT TO TREE PRESERVATION ORDERS
- Schedule 8 LAND OF WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 10 LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED
- Schedule 11 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- 1Interpretation
- 2Application of the Enforcement Regulations
- 3Imposition of charges for the tunnel area
- 4Payment of charges
- 5Payments for local residents
- 6Other payments
- 7Penalty charge for non-payment of road user charge
- 8Exercise of powers
- 9Examination of motor vehicles
- 10Entering motor vehicles
- 11Seizure
- 12Immobilisation of motor vehicles
- 13Removal, storage and disposal of motor vehicles
1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
3 FOR THE PROTECTION OF DRAINAGE AUTHORITIES
4 FOR THE PROTECTION OF RAILWAY INTERESTS
5 FOR THE PROTECTION OF SPECIFIED GAS UNDERTAKERS
- 48Application
- 49Interpretation
- 50On Street apparatus
- 51Apparatus of the gas undertaker in stopped up streets
- 52Protective works to buildings
- 53Acquisition of land
- 54Removal of apparatus
- 55Facilities and rights for alternative apparatus
- 56Retained apparatus: protection of the gas undertaker
- 57Expenses
- 58Indemnity
- 59Enactments and agreements
- 60Co-operation
- 61Access
- 62Arbitration
- 63Notices
6 FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER
- 64Application
- 65Interpretation
- 66
- 67Apparatus of National Grid in stopped up streets
- 68Protective works to buildings
- 69Acquisition of land
- 70Removal of apparatus
- 71Facilities and rights for alternative apparatus
- 72Retained apparatus: protection of gas undertaker
- 73Expenses
- 74Indemnity
- 75Enactments and agreements
- 76Co-operation
- 77Access
- 78Arbitration
- 79Notices
7 FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER
- 80Application
- 81Interpretation
- 82
- 83Apparatus of National Grid in stopped up streets
- 84Protective works to buildings
- 85Acquisition of land
- 86Removal of apparatus
- 87Facilities and rights for alternative apparatus
- 88Retained apparatus: protection of electricity undertaker
- 89Expenses
- 90Indemnity
- 91Enactments and agreements
- 92Co-operation
- 93Access
- 94Arbitration
- 95Notices
8 FOR THE PROTECTION OF THE PORT OF LONDON AUTHORITY
- 96Application
- 97Interpretation
- 98Approval of detailed design (excluding the tunnelling works)
- 99Design of, and coordination of, tunnelling works to ensure existing and future use of river Thames
- 100Construction of tunnelling works
- 101As built drawings
- 102Discharges etc.
- 103Removal of temporary works
- 104Protective action
- 105Facilities for navigation
- 106Use of land above the riverbed of the river Thames
- 107Survey of the river Thames riverbed
- 108Statutory functions
- 109Indemnity
- 110Disposals, etc.
- 111Navigational lights, buoys, etc.
- 112Directions as to lights
- 113Removal, etc. of the PLA’s moorings and buoys
- 114Abandoned or decayed works
- 115Apparatus in the tunnel area
- 116Disputes
9 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
- 117Application and Interpretation
- 118Submission and approval of plans
- 119Construction of protective works
- 120Timing of works and service of notices
- 121Works not in accordance with this Part
- 122Maintenance of works
- 123Remediating impaired drainage work
- 124Agency access
- 125Free passage of fish
- 126Indemnity
- 127
- 128Disputes
10 FOR THE PROTECTION OF PORT OF TILBURY LONDON LIMITED
- 129Application
- 130Interpretation
- 131Approval of plans
- 132Approval of specified easements
- 133Restoration of Port land
- 134Consultation
- 135Notification of works to utilities and services affecting the Port
- 136Construction traffic management protocol within the Port
- 137Streets
- 138Minimising disruption to affected roads and streets within the Port
- 139Obstruction within the Port
- 140Land powers
- 141As-built plans
- 142Accumulation and erosion
- 143Permitting
- 144Port closure in emergency
- 145Interaction with the Tilbury2 Order
- 146Safeguarding of access to the Port by rail
- 147Disposals, etc.
- 148Costs
- 149Indemnity
- 150Disputes
11 FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
- 151Application
- 152Definitions
- 153Design input and commencement
- 154
- 155Survey reinstatement
- 156Inspections and testing of materials
- 157Road Safety Audits
- 158Defects in local highways constructed by the undertaker
- 159Provisional Certificate
- 160Maintenance
- 161Final Certificate
- 162Emergency Work
- 163Land interests
- 164Disputes
2 LICENSABLE MARINE ACTIVITIES
- 7General conditions
- 8
- 9Distribution of copies
- 10Construction method statement
- 11Marine pollution contingency plan
- 12Concrete and cement
- 13Coatings and treatment
- 14Spills, etc.
- 15Piling techniques
- 16Noise registry
- 17Removal of temporary structures, etc.
- 18Notice of completion of licensable marine activity
- 19Licensable marine activity at Coalhouse Point
5 PROCEDURE FOR THE DISCHARGE OF CONDITIONS