The Cambridge Waste Water Treatment Plant Relocation Order 2025
Typestatutory instrumentDate2 Apr 2025Articles252Cited by13 documents
- 26Compulsory acquisition of land
- 27Time limit for exercise of authority to acquire land compulsorily
- 28Compulsory acquisition of rights and imposition of restrictive covenants
- 29Acquisition of subsoil only
- 30Acquisition of land limited to subsoil lying more than 7 metres beneath surface
- 31Private Rights
- 32Power to override easements and other rights
- 33Application and modification of the 1981 Act
- 34Modification of Part 1 of the 1965 Act
- 35Temporary use of land for carrying out the authorised development
- 36Temporary use of land for maintaining the authorised development
- 37Disregard of certain interests and improvements
- 38Set-off for enhancement in value of retained land
- 39No double recovery
- 40Compulsory acquisition of land – incorporation of the mineral code
- 41Statutory undertakers
- 42Recovery of costs of new connections
- 43Rights under or over streets
- 44Rights on the river Cam
- 45Application of landlord and tenant law
- 46Operational land for the purposes of the 1990 Act
- 47Protective Provisions
- 48Discharge of requirements and other approvals etc
- 49Application, disapplication and modification of legislative provisions
- 50Crown rights
- 51Certification of plans etc.
- 52Arbitration
- 53Service of notices
- 1
- 2Time limit
- 3Phasing
- 4Parameters of authorised development
- 5Requirement for written approval
- 6Approved details and amendments to them
- 7Detailed design
- 8Code of construction practice
- 9Construction environmental management plans
- 10Outfall
- 11Landscape, ecological and recreational management plan
- 12Operational workers travel plan
- 13Archaeological investigation mitigation strategy
- 14Construction lighting
- 15Drainage
- 16Contamination risk
- 17Decommissioning
- 18Operational Asset Management Plan
- 19Operational logistics traffic plan
- 20Odour management plan
- 21Carbon management plan
- 22Operational water quality monitoring plan
- 23Discovery centre
- 24Operational Wildlife Hazard Management Plan
- 25Biodiversity net gain
- 26Temporary stopping up of public rights of way
- 27Bridleway
2 PROCEDURE FOR DISCHARGE OF CERTAIN APPROVALS
- Schedule 3 STREETS SUBJECT TO STREET WORKS
- Schedule 4 STREETS SUBJECT TO ALTERATION OF LAYOUT
- Schedule 5 STREETS TO BE TEMPORARILY STOPPED UP
- Schedule 6 PUBLIC RIGHTS OF WAY
- Schedule 7 ACCESS TO WORKS
- Schedule 8 SPEED LIMITS
- Schedule 9 TRAFFIC REGULATION
- Schedule 10 LAND IN WHICH ONLY NEW RIGHTS ETC MAY BE ACQUIRED
- Schedule 11 LAND OF WHICH ONLY SUBSOIL MORE THAN 7 METRES BENEATH THE SURFACE MAY BE ACQUIRED TOGETHER WITH NE
- Schedule 12 LAND OF WHICH TEMPORARY POSSESSION ONLY MAY BE TAKEN
1 FOR THE PROTECTION OF ELECTRICITY AND GAS UNDERTAKERS
2 FOR THE PROTECTION OF EASTERN POWER NETWORKS PLC
3 FOR THE PROTECTION OF CADENT GAS LIMITED AS GAS UNDERTAKER
- 19Application
- 20Interpretation
- 21On street apparatus
- 22Apparatus of Cadent in stopped up streets
- 23Protective works to buildings
- 24Acquisition of land
- 25Removal of apparatus
- 26Facilities and rights for alternative apparatus
- 27Retained apparatus: protection of Cadent
- 28Expenses
- 29Indemnity
- 30Enactments and agreements
- 31Co-operation
- 32Access
- 33Arbitration
- 34Notices
4 FOR THE PROTECTION OF RAILWAY INTERESTS
5 FOR THE PROTECTION OF NATIONAL HIGHWAYS LIMITED
- 55Application etc.,
- 56Interpretation
- 57General
- 58
- 59Works outside the Order limits
- 60Prior approvals and security
- 61Construction of the specified works
- 62Payments
- 63Provisional Certificate
- 64Opening
- 65Final condition survey
- 66Defects Period
- 67Final Certificate
- 68Security
- 69Commuted sums
- 70Insurance
- 71Indemnity
- 72Maintenance of the specified works
- 73Land or rights
- 74Expert Determination
6 FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
- 75Application etc.
- 76Interpretation
- 77
- 78Dispositions
- 79Prior approvals and security
- 80Construction of the specified works
- 81Programme and method statement/commencement of the specified works
- 82Deviations from approved programme and method statement and traffic management proposals
- 83Completion of the works
- 84Access, inspection and testing
- 85Inspection and testing (covered work and foundations)
- 86Statutory undertakers (highways)
- 87Progress of the specified works
- 88Provisional Certificate of Completion
- 89Maintenance and defects correction
- 90Stage 4 safety audit
- 91Final Certificate
- 92Indemnity
- 93Insurance
- 94Variation to council specification and approved drawings
- 95Default
- 96CDM Regulations
- 97Telecommunications apparatus
- 98Commuted sum and asset fees
- 99Safety Audit Costs
- 100Cash Deposit
- 101Dispute provisions
- 102Documents submitted for approval
- 103Agreement Fee
- 104Additional technical vetting costs
- 105Submissions of Drawings
- 106As built drawings
7 FOR THE PROTECTION OF THE RELEVANT NAVIGATION AUTHORITY
8 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
9 FOR THE PROTECTION OF CAMBRIDGE WATER
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.