, The North Lincolnshire Green Energy Park Order 2025

In forcesince 4 Apr 2025

(1)

Component

(2)

Maximum dimensions

(m)

(2)

Maximum height above Finished Floor Level (FFL)

(m)

(2)

Maximum height AOD

(m)

ERF (Work No. 1) | Tipping hall | 87.5 x 60 | 31 | 37.6

Bunker hall | 92 x 40 | 43 | 49.6

Boiler hall | 105 x 60 | 55 | 61.6

Flue gas treatment hall | 41 x 60 | 45 | 51.6

Turbine hall | 80 x 37 | 25 | 31.6

Bottom ash hall | 37 x 37 | 25 | 31.6

Transformer compound | 52 x 22 | 10 | 16.6

Switchyard | 93 x 44 | 10 | 14.6

Offices and admin facilities | 30 x 100 | 43 | 49.6

Fire water tank | 11.3 diameter | 19.3 | 25.9

Fire water pumphouse | 6 x 6 | 6.5 | 13.1

Gatehouses | 32 x 12 | 5 | 11.6

Visual barriers | | 4.5 | 11.1

ERF stack windshield (Work No. 1A) | 10 diameter | 120 | 126.6

Back up boilers stack windshield (Work No. 1A) | 3 diameter | 53 | 59.6

Back-up generator stack (Work No. 1A) | 0.85 diameter | 55 | 61.6

Carbon capture utilisation and storage facility (Work No. 1B) | 79 x 66 | 50 | 56.6

Carbon dioxide storage tanks (Work No. 1B) | 28 x 20 | 20 | 26.6

Visitor centre (Work No. 1C) | 41 x 36 | 16 | 19.05

Elevated walkway (Work No. 1 and 1C) | 700 x 4 | 12 | 17.05

Air-cooled condensers/Air blast chillers (Work No. 1D) | 75 x 35 | 50 | 56.6

RHTF and CBMF (Work No. 2) | process building and storage areas | 280 x 130 | 25 | 30.1

Admin buildings | 62 x 10 | 21 | 26.1

Rail Infrastructure (Work No. 3) | Footbridge No. 1 | | | 55.385

Footbridge No. 2 | | | 48.561

Access road (Work No. 5) | | | 5.2

Plastic recycling facility (Work No. 6) | Pre-processed material storage | 65 x 35 | 10 | 13.9

Heat exchange building | 35 x 17 | 15 | 18.9

Post processed storage | 5 x 16.4 | 15 | 18.9

Electrical rooms | 15 x 7 | 10 | 13.9

Process building | 130 x 80 | 25 | 28.9

Admin building | 62 x 10 | 21 | 24.9

Hydrogen electrolyser (Work No. 7) | Northern Gas AGI | 60 x 60 | 5 | 9.6

Northern hydrogen production and storage facility | 100 x 25 | 8 | 12.6

Vehicle refuelling station

(Work No. 8)

95 x 80 | 12.5 | 15.5

Hydrogen refuelling station (Work No. 8) | Southern Gas AGI | 60 x 60 | 5 | 10.1

Southern hydrogen production and storage facility | 100 x 25 | 8 | 11.6

Battery storage facility (Work No. 9) | 115 x 58 | 8.5 | 11.5

Changed on 4 Apr 2025

| 95 x 80 | 12.5 | 15.5

  1. 4 Apr 2025 – todayin force
  2. 13 Mar 2025 – 4 Apr 2025earlier wording