The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024
- 17Compulsory acquisition of land
- 18Time limit for exercise of authority to acquire land compulsorily
- 19Compulsory acquisition of rights
- 20Private rights over land
- 21Application of the 1981 Act
- 22Acquisition of subsoil or airspace only
- 23Modification of Part 1 of the 1965 Act
- 24Rights under or over streets
- 25Temporary use of land for carrying out the authorised project
- 26Temporary use of land for maintaining the authorised project
- 27Statutory undertakers
- 28Recovery of costs of new connections
- 31Application of landlord and tenant law
- 32Operational land for purposes of the 1990 Act
- 33Felling or lopping of trees and removal of hedgerows
- 34Trees subject to tree preservation orders
- 35Saving provisions for Trinity House
- 36Crown rights
- 37Certification of plans and documents, etc.
- 38Abatement of works abandoned or decayed
- 39Funding
- 40Protective provisions
- 41Service of notices
- 42Arbitration
- 43Procedure in relation to approvals, etc. under requirements
- 44Modification of DOW section 36 consent
- 45Compensation
- 1n11 Time limits
- 8Offshore decommissioning
- 9Scenarios and Phases of authorised development
- 10Detailed design parameters onshore
- 11Provision of landscaping
- 12Implementation and maintenance of landscaping
- 13Ecological management plan
- 14Fencing and other means of enclosure
- 15Traffic and Transport
- 16Highway accesses
- 17Operational Drainage Strategy
- 18Onshore Archaeology
- 19Code of construction practice
- 20Construction hours
- 21Control of noise during operational phase
- 22Control of artificial light emissions
- 23European protected species: onshore
- 24Public Rights of Way Strategy
- 25Restoration of land used temporarily for construction
- 26Local skills and employment
- 27Ministry of Defence surveillance operations
- 28Cromer and Claxby Primary Surveillance Radar
- 29Onshore decommissioning
- 30Notification of generation of power
- 31Amendments to approved details
- 32Contaminated land and groundwater scheme
- 33Onshore collaboration
- 34Mitigation of effects on pink footed geese
- 35Obstacle free zone for navigational safety
- 1Time limits
- 2Detailed offshore design parameters
- 3
- 4
- 5
- 6
- 7
- 8Offshore decommissioning
- 9Scenarios and Phases of authorised development
- 10Detailed design parameters onshore
- 11Provision of landscaping
- 12Implementation and maintenance of landscaping
- 13Ecological management plan
- 14Fencing and other means of enclosure
- 15Traffic and Transport
- 16Highway accesses
- 17Operational Drainage Strategy
- 18Onshore Archaeology
- 19Code of construction practice
- 20Construction hours
- 21Control of noise during operational phase
- 22Control of artificial light emissions
- 23European protected species: onshore
- 24Public Rights of Way Strategy
- 25Restoration of land used temporarily for construction
- 26Local skills and employment
- 27Ministry of Defence surveillance operations
- 28Cromer and Claxby Primary Surveillance Radar
- 29Onshore decommissioning
- 30Notification of generation of power
- 31Amendments to approved details
- 32Contaminated land and groundwater scheme
- 33Onshore collaboration
- 34Mitigation of effects on pink footed geese
- 35Obstacle free zone for navigational safety
2 Approval of matters specified in requirements
- 1Design parameters
- 2
- 3
- 4Scenarios and Phases of authorised project
- 5Vessels under the undertaker’s control
- 6Extension of time periods
- 7Notifications and inspections
- 8Aids to navigation
- 9Colouring of Structures
- 10Aviation safety
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14Site Integrity Plan
- 15Approval of programmes, statements etc
- 16Offshore safety management
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring and surveys
- 20Post-construction monitoring and surveys
- 21Reporting of scour and cable protection
- 22Completion of construction
- 23Sediment Sampling
- 24Collaboration
- 25Obstacle free zone for navigational safety
- 1Design parameters
- 2
- 3
- 4Scenarios and Phases of authorised project
- 5Vessels under the undertaker’s control
- 6Extension of time periods
- 7Notifications and inspections
- 8Aids to navigation
- 9Colouring of Structures
- 10Aviation safety
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14Site Integrity Plan
- 15Approval of programmes, statements etc
- 16Offshore safety management
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring and surveys
- 20Post-construction monitoring and surveys
- 21Reporting of scour and cable protection
- 22Completion of construction
- 23Sediment Sampling
- 24Collaboration
- 25Obstacle free zone for navigational safety
- 1Design parameters
- 2
- 3Scenarios and Phases of authorised project
- 4Vessels under the undertaker’s control
- 5Extension of time periods
- 6Notifications and inspections
- 7Aids to navigation
- 8Colouring of structures
- 9Aviation safety
- 10Chemicals, drilling and debris
- 11Force majeure
- 12Pre-construction plans and documentation
- 13Site Integrity Plan
- 14
- 15Offshore safety management
- 16Reporting of engaged agents, contractors and vessels
- 17Pre-construction monitoring and surveys
- 18Construction monitoring and surveys
- 19Post-construction monitoring and surveys
- 20Reporting of scour and cable protection
- 21Completion of construction
- 22Sediment Sampling
- 23Collaboration
- 24Seasonal Restriction
- 25Obstacle free zone for navigational safety
- 2
- 3Scenarios and Phases of authorised project
- 4Vessels under the undertaker’s control
- 5Extension of time periods
- 6Notifications and inspections
- 7Aids to navigation
- 8Colouring of structures
- 9Aviation safety
- 10Chemicals, drilling and debris
- 11Force majeure
- 12Pre-construction plans and documentation
- 13Site Integrity Plan
- 14
- 15Offshore safety management
- 16Reporting of engaged agents, contractors and vessels
- 17Pre-construction monitoring and surveys
- 18Construction monitoring and surveys
- 19Post-construction monitoring and surveys
- 20Reporting of scour and cable protection
- 21Completion of construction
- 22Sediment Sampling
- 23Collaboration
- 24Seasonal Restriction
- 25Obstacle free zone for navigational safety
1 Protection of electricity, gas, water and sewerage undertakers
2 Protection for operators of electronic communications code networks
3 For the protection of Network Rail Infrastructure Limited
4 For the protection of the Environment Agency
5 For the protection of the drainage authorities
6 For the protection of National Gas Transmission Plc as Gas Undertaker
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of National Gas Transmission in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
7 For the protection of National Grid Electricity Transmission Plc
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of National Grid in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
8 For the protection of Cadent Gas Limited as Gas Undertaker
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of Cadent in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection of Cadent
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
9 For the protection of Anglian Water Services Limited
10 For the protection of Norfolk Vanguard
11 For the protection of Norfolk Boreas
12 For the protection of Eastern Power Networks Plc
- 1Application
- 2Interpretation
- 3
- 4Apparatus of Protected Persons in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: Protection
- 10Expenses
- 11
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
13 For the protection of National Highways Limited
- 1Application etc.
- 2Interpretation
- 3General
- 4
- 5
- 6Works outside the Order limits
- 7Prior approvals and security
- 8Construction of the specified works
- 9Payments
- 10Provisional certificate
- 11Opening
- 12Final condition survey
- 13Defects period
- 14Final certificate
- 15Security
- 16Commuted sums
- 17Insurance
- 18Indemnity
- 19Maintenance of the specified works
- 20Land
- 21Expert Determination
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.