The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024
The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order…
Typestatutory instrumentDate14 Mar 2024Articles207Versions held2Cited by17 documentsLast changed12 Jun 2024
- 22Compulsory acquisition of land
- 23Compulsory acquisition of land – incorporation of the mineral code
- 24Time limit for exercise of authority to acquire land and rights compulsorily
- 25Compulsory acquisition of rights
- 26Extinguishment and suspension of private rights
- 27Extinguishment of private rights and restrictive covenants relating to apparatus removed from land subject
- 28Power to override easements and other rights
- 29Disregard of certain interests and improvements
- 30Set-off for enhancement in value of retained land
- 31No double recovery
- 32Modification of Part 1 of the 1965 Act
- 33Application of the 1981 Act
- 34Acquisition of subsoil or airspace only
- 35Use of subsoil under or airspace over streets
- 36Temporary use of land by National Grid
- 37Temporary use of land by NPG
- 38Temporary use of land by NGN
- 39Temporary use of land for maintaining the authorised development
- 40Statutory undertakers
- 41Recovery of costs of new connections
- 42Application of landlord and tenant law
- 43Defence to proceedings in respect of statutory nuisance
- 44Maintenance of drainage works
- 45Traffic regulation
- 46Felling or lopping of trees and removal of hedgerows
- 47Protection of interests
- 48Certification of plans, etc.
- 49Service of notices
- 50Procedure regarding certain approvals, etc.
- 51Amendment of local legislation
- 52Arbitration
- 53Temporary closure of, and works in, the river Ouse
- 1Interpretation
- 2Time limits
- 3Design drawings
- 4Stages of authorised development
- 5Construction management plans
- 6Construction management plans to be approved
- 7Construction hours
- 8Landscaping at Overton, Tadcaster and Monk Fryston
- 9Retention and protection of existing trees
- 10Replacement planting
- 11Reinstatement schemes
- 12Contamination of land or groundwater and controlled waters
- 13Removal of temporary bridges and culverts
- 14Highway works
- 15Removal of existing overhead line
- 16Decommissioning
- 17Clearance over the River Ouse
- 18Approval of details having regard to the Design Approach to Site Specific Infrastructure
- 19Site specific mitigation scheme
- Schedule 6 STREETS SUBJECT TO STREET WORKS
- Schedule 7 STREETS SUBJECT TO ALTERATION OF LAYOUT
- Schedule 8 STREETS, CYCLE TRACKS OR PUBLIC RIGHTS OF WAY TO BE TEMPORARILY CLOSED
- Schedule 9 ACCESS TO WORKS
- Schedule 11 EXTINGUISHMENT OF PRIVATE RIGHTS AND RESTRICTIVE COVENANTS RELATING TO APPARATUS REMOVED FROM LAND
- Schedule 12 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 13 LAND IN WHICH ONLY NEW RIGHTS AND RESTRICTIVE COVENANTS ETC. MAY BE ACQUIRED
- Schedule 14 TRAFFIC REGULATION
1 PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
2 PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
3 FOR THE PROTECTION OF THE CANAL & RIVER TRUST
- 12Interpretation
- 13Notice to be given prior to specified works
- 14Fencing
- 15Survey of waterway
- 16Approval of plans etc.
- 17Failure to complete specified works
- 18Lighting
- 19Construction of specified works
- 20Access to work – provision of information
- 21Maintenance of works
- 22Repayment of the Trust’s fees, etc.
- 23Making good of detriment; compensation and indemnity, etc.
- 24Arbitration
- 25As built drawings
4 FOR THE PROTECTION OF RAILWAY INTERESTS
5 FOR THE PROTECTION OF NORTHERN POWERGRID
6 FOR THE PROTECTION OF NATIONAL HIGHWAYS LIMITED
- 61Application etc.,
- 62Interpretation
- 63General
- 64
- 65
- 66Works outside the Order limits
- 67Prior approvals and security
- 68Construction of the specified works
- 69Payments
- 70Provisional Certificate
- 71Opening
- 72Final condition survey
- 73Defects Period
- 74Final Certificate
- 75Security
- 76Insurance
- 77Indemnity
- 78Maintenance of the specified works
- 79Land
- 80Arbitration
7 FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER
- 81Application
- 82Interpretation
- 83On Street Apparatus
- 84Apparatus of NGT in affected streets
- 85Protective works to buildings
- 86Acquisition of land
- 87Removal of apparatus
- 88Facilities and rights for alternative apparatus
- 89Retained apparatus: protection
- 90Expenses
- 91Indemnity
- 92Enactments and agreements
- 93Co-operation
- 94Access
- 95Arbitration
- 96Notices
8 FOR THE PROTECTION OF NORTHERN GAS NETWORK’S APPARATUS
- 97Application
- 98Interpretation
- 99
- 100Apparatus of Statutory undertaker in affected streets
- 101Acquisition of land
- 102Removal or diversion of apparatus
- 103Facilities and rights for alternative apparatus
- 104Retained apparatus: protection
- 105Expenses
- 106Enactments and agreements
- 107Co-operation
- 108Access
- 109Arbitration
- 110Works falling outside of development authorised by the Order
- 111Cathodic protection testing