The Net Zero Teesside Order 2024
- 21aSupplemental land
- 22Compulsory acquisition of land
- 23Power to override easements and other rights
- 24Time limit for exercise of authority to acquire land compulsorily
- 25Compulsory acquisition of rights etc.
- 26Private rights
- 27Application of the 1981 Act
- 28Acquisition of subsoil and airspace only
- 29Modification of Part 1 of the 1965 Act
- 30Rights under or over streets
- 31Temporary use of land for carrying out the authorised development
- 32Temporary use of land for maintaining the authorised development
- 33Statutory undertakers
- 34Apparatus and rights of statutory undertakers in streets
- 35Recovery of costs of new connections
- 36Compulsory acquisition of land – incorporation of the mineral code
- 37Deemed marine licence
- 38Application of landlord and tenant law
- 39Operational land for purposes of the 1990 Act
- 40Defence to proceedings in respect of statutory nuisance
- 41Protection of interests
- 42Saving for Trinity House
- 43Crown Rights
- 44Procedure in relation to certain approvals
- 45Certification of plans etc.
- 46Service of notices
- 47Arbitration
- 48Funding for compulsory acquisition compensation
- 1Commencement of the authorised development
- 2Notice of start and completion of commissioning
- 3Detailed design
- 4Landscape and biodiversity protection management and enhancement
- 5Public rights of way and access land management
- 6External lighting
- 7Highway accesses
- 8Means of enclosure
- 9Site security
- 10Fire prevention
- 11Surface and foul water drainage
- 12Flood risk mitigation
- 13Contaminated land and groundwater
- 14Archaeology
- 15Protected species
- 16Construction environmental management plan
- 17Protection of highway surfaces
- 18Construction traffic management plan
- 19Construction workers travel plan
- 20Construction hours
- 21Control of noise - construction
- 22Control of noise - operation
- 23Piling and penetrative foundation design
- 24Waste management on site - construction wastes
- 25Restoration of land used temporarily for construction
- 26Combined heat and power
- 27Aviation warning lighting
- 28Air safety
- 29Local liaison group
- 30Employment, skills and training plan
- 31Carbon dioxide capture transfer and storage
- 32Decommissioning
- 33Requirement for written approval
- 34Approved details and amendments to them
- 35Amendments agreed by the relevant planning authority
- 36Consultation with South Tees Development Corporation
- 37Effluent nutrient nitrogen safeguarding scheme
- 38Consultation with Sembcorp and TG entities
- 9General
- 10Notifications and Inspections
- 11Pre-construction
- 12
- 13
- 14Reporting of engaged agents, contractors and vessels
- 15Written scheme of archaeological investigation
- 16Construction, Operation and Maintenance
- 17
- 18
- 19
- 20
- 21
- 22UXO Clearance
- 23Post Construction
- 24Disposal
- 25
- 26
- 27
- 28Provision of Information
- 29Amendments to plans etc.
- 30Maximum parameters
- 31Safety Management
- 32Provision of Information
- 9General
- 10Notifications and Inspections
- 11Pre-construction
- 12
- 13
- 14Reporting of engaged agents, contractors and vessels
- 15Written scheme of archaeological investigation
- 16Construction, Operation and Maintenance
- 17
- 18
- 19
- 20
- 21
- 22UXO Clearance
- 23Post Construction
- 24Disposal
- 25
- 26
- 27
- 28Provision of Information
- 29Amendments to plans etc.
- 30Maximum parameters
- 31Safety Management
- 32Provision of Information
1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
3 FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION AS ELECTRICITY UNDERTAKER
- 17Application
- 18Interpretation
- 19On Street Apparatus
- 20Apparatus of National Grid in streets subject to temporary stopping up
- 21Protective works to buildings
- 22Removal of apparatus
- 23Facilities and rights for alternative apparatus
- 24Retained apparatus
- 25Expenses
- 26Indemnity
- 27Enactments and agreements
- 28Co-operation
- 29Access
- 30Arbitration
- 31Notices
4 FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER
- 32Application
- 33Interpretation
- 34On Street Apparatus
- 35Apparatus of National Gas in streets subject to temporary stopping up
- 36Protective works to buildings
- 37Removal of apparatus
- 38Facilities and rights for alternative apparatus
- 39Retained apparatus
- 40Expenses
- 41Indemnity
- 42Enactments and agreements
- 43Co-operation
- 44Access
- 45Arbitration
- 46Notices
5 FOR THE PROTECTION OF AIR PRODUCTS PLC
6 FOR THE PROTECTION OF CATS NORTH SEA LIMITED
7 FOR THE PROTECTION OF CF FERTILISERS UK LIMITED
8 FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD AND EXOLUM RIVERSIDE LTD
9 FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED
10 FOR THE PROTECTION OF MARLOW FOODS LIMITED
11 FOR THE PROTECTION OF RAILWAY INTERESTS
12 FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC
13 FOR THE PROTECTION OF NPL WASTE MANAGEMENT LIMITED
14 FOR THE PROTECTION OF PD TEESPORT LIMITED
15 FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED
16 FOR THE PROTECTION OF SABIC PETROCHEMICALS UK LIMITED
17 FOR THE PROTECTION OF THE SEMBCORP PROTECTION CORRIDOR
- 213Extent of this Part
- 214Interpretation of this Part
- 215Separate approvals by third party owners or operators
- 216Removal of apparatus
- 217Alternative apparatus
- 218Consent under this Part in connection with Sembcorp operations
- 219
- 220
- 221
- 222Insurance
- 223Expenses
- 224Indemnity
- 225Participation in community groups
- 226Notice of start and completion of commissioning
- 227Arbitration
- 228Additional Agreement
18 FOR THE PROTECTION OF ANGLO AMERICAN
- 229Interpretation
- 230
- 231Consent to works in the shared area
- 232Co-operation
- 233Regulation of works within the shared area
- 234Regulation of powers over the shared area
- 235Constructability Principles
- 236Interface Design Process
- 237Design Principles
- 238Maintenance and Operational Principles
- 239Miscellaneous provisions
- 240Indemnity
- 241Dispute Resolution
- 242
- 243
- 244
- 245
- 246
19 FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK LIMITED
20 FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION
21 FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS
22 FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED
23 FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED
24 FOR THE PROTECTION OF NAVIGATOR TERMINALS SEAL SANDS LIMITED
25 FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED
26 FOR THE PROTECTION OF NORTHERN GAS NETWORKS LIMITED
- 352Application
- 353Interpretation
- 354
- 355Apparatus of statutory undertaker in stopped up streets
- 356Acquisition of land
- 357Removal or diversion of apparatus
- 358Facilities and rights for alternative apparatus
- 359Retained apparatus: protection
- 360Expenses
- 361Indemnity
- 362Enactments and agreements
- 363Co-operation
- 364Access
- 365Arbitration
- 366Works falling outside of development authorised by the Order
- 367Cathodic protection testing
27 FOR THE PROTECTION OF NORTH TEES LIMITED, NORTH TEES RAIL LIMITED AND NORTH TEES LAND LIMITED
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.