The Hornsea Four Offshore Wind Farm Order 2023
Typestatutory instrumentDate12 Jul 2023Articles334Versions held4Cited by21 documentsLast changed14 Apr 2025
- 18Compulsory acquisition of land
- 19Compulsory acquisition of land: minerals
- 20Time limit for exercise of authority to acquire land compulsorily
- 21Compulsory acquisition of rights etc.
- 22Private Rights
- 23Application of the 1981 Act
- 24Statutory authority to override easements and other rights
- 25Acquisition of subsoil only
- 26Modification of Part 1 of the 1965 Act
- 27Rights under or over streets
- 28Temporary use of land for carrying out the authorised project
- 29Temporary use of land for maintaining the authorised project
- 30Statutory undertakers
- 31Recovery of costs of new connections
- 34Application of landlord and tenant law
- 35Operational land for purposes of the 1990 Act
- 36Felling or lopping of trees and removal of hedgerows
- 37Trees subject to tree preservation orders
- 38Certification of plans and documents, etc.
- 39Arbitration
- 40Requirements, appeals, etc.
- 41Abatement of works abandoned or decayed
- 42Saving provisions for Trinity House
- 43Crown rights
- 44Protective provisions
- 45Funding
- 46Amendment and modification of statutory provisions
- 47Service of notices
- 48Modification of Section 106 agreements relating to land
- 49Compensation provisions
- 1Time limits
- 2Detailed offshore design parameters
- 3
- 4
- 5
- 6Biodiversity net gain
- 7Detailed design approval onshore
- 8Provision of landscaping
- 9Implementation and maintenance of landscaping
- 10Ecological management plan
- 11Highway accesses
- 12Fencing and other means of permanent enclosure
- 13Temporary fencing and other temporary means of enclosure
- 14Surface and foul water drainage
- 15Contaminated land and groundwater scheme
- 16Surface water
- 17Onshore archaeology
- 18Code of construction practice
- 19Construction traffic management plan
- 20European protected species onshore
- 21Restoration of land used temporarily for construction
- 22Control of noise during operational phase
- 23Enhancement strategy
- 24Ministry of Defence radar mitigation
- 25Onshore decommissioning
- 26Employment and skills plan
- 27Energy balancing infrastructure safety management
- 28Stages of authorised development
- 29Claxby Radar Mitigation
- 30Requirement for written approval
- 31Amendments to approved details
4 PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- Schedule 2 STREETS SUBJECT TO STREET WORKS
- Schedule 3 STREETS TO BE TEMPORARILY CLOSED OR RESTRICTED
- Schedule 4 PUBLIC RIGHTS OF WAY TO BE CLOSED OR DIVERTED AND ACCESS LAND
- Schedule 5 ACCESS TO WORKS
- Schedule 6 LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED
1 PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
2 PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
PART 3A - NATIONAL GRID ELECTRICITY TRANSMISSION PLC
- 1Application
- 2Interpretation
- 3
- 4Apparatus of National Grid in streets subject to temporary closure
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: Protection of National Grid as Electricity Undertaker
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
PART 3B - NATIONAL GRID GAS PLC
- 17Application
- 18Interpretation
- 19
- 20Apparatus of National Grid in streets subject to temporary closure
- 21Protective works to buildings
- 22Acquisition of land
- 23Removal of apparatus
- 24Facilities and rights for alternative apparatus
- 25Retained apparatus: protection of National Grid as Gas Undertaker
- 26Expenses
- 27Indemnity
- 28Enactments and agreements
- 29Co-operation
- 30Access
- 31Arbitration
- 32Notices
4 PROTECTION OF RAILWAY INTERESTS
5 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
6 FOR THE PROTECTION OF DRAINAGE AUTHORITIES
8 FOR THE PROTECTION OF NEO ENERGY (SNS) LIMITED
9 FOR THE PROTECTION OF NORTHERN POWERGRID (YORKSHIRE) PLC
10 FOR THE PROTECTION OF THE KUMATAGE FIELD
- 1Design parameters
- 2
- 3
- 4Maintenance of the authorised development
- 5Vessels under the undertaker’s control
- 6Extension of time periods
- 7Notifications and inspections
- 8Aids to navigation
- 9Colouring of structures
- 10Aviation safety
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15Offshore safety management
- 16Reporting of engaged agents, contractors and vessels
- 17Pre-construction monitoring and surveys
- 18Construction monitoring
- 19Post-construction monitoring
- 20Timing of monitoring report
- 21Reporting of impact pile driving
- 22Maintenance reporting
- 23Stages of construction
- 24Completion of construction
- 25
- 26Deployment of cable protection
- 27Southern North Sea Special Area of Conservation Site Integrity Plan
- 1Design parameters
- 2
- 3
- 4Maintenance of the authorised development
- 5Vessels under the undertaker’s control
- 6Extension of time periods
- 7Notifications and inspections
- 8Aids to navigation
- 9Colouring of structures
- 10Aviation safety
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15Offshore safety management
- 16Reporting of engaged agents, contractors and vessels
- 17Pre-construction monitoring and surveys
- 18Construction monitoring
- 19Post-construction monitoring
- 20Timing of monitoring report
- 21Reporting of impact pile driving
- 22HVAC booster station lighting plan
- 23Piling restriction
- 24Maintenance reporting
- 25Stages of construction
- 26Completion of construction
- 27Deployment of cable protection
- 28Southern North Sea Special Area of Conservation Site Integrity Plan
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.