The Norfolk Vanguard Offshore Wind Farm Order 2022
- 18Compulsory acquisition of land
- 19Time limit for exercise of authority to acquire land compulsorily
- 20Compulsory acquisition of rights and the imposition of restrictive covenants
- 21Private rights
- 22Application of the 1981 Act
- 23Application of Part 1 of the 1965 Act
- 24Acquisition of subsoil or airspace only
- 25Rights under or over streets
- 26Temporary use of land for carrying out the authorised project
- 27Temporary use of land for maintaining authorised project
- 28Extinguishment of private rights and restrictive covenants relating to apparatus removed from land subject
- 29Statutory undertakers
- 30Recovery of costs of new connections
- 33Application of landlord and tenant law
- 34Operational land for purposes of the 1990 Act
- 35Felling or lopping of trees and removal of hedgerows
- 36Trees subject to tree preservation orders
- 37Certification of plans etc
- 38Arbitration
- 39Procedure in relation to certain approvals etc
- 40Abatement of works abandoned or decayed
- 41Saving provisions for Trinity House
- 42Crown rights
- 43Service of Notices
- 44Protective provisions
- 45Compensation to protect the coherence of the national site network
- 1Time limits
- 2Detailed offshore design parameters
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12Aviation safety
- 13Ministry of Defence surveillance operations
- 14Offshore decommissioning
- 15Stages of authorised development onshore
- 16Detailed design parameters onshore
- 17Landfall method statement
- 18Provision of landscaping
- 19Implementation and maintenance of landscaping
- 20Code of construction practice
- 21Traffic
- 22Highway accesses
- 23Archaeological written scheme of investigation
- 24Ecological management plan
- 25Watercourse crossings
- 26Construction hours
- 27Control of noise during operational phase and during maintenance
- 28European protected species onshore
- 29Onshore decommissioning
- 30Requirement for written approval
- 31Amendments to approved details
- 32Operational drainage plan
- 33Skills and employment strategy
- 34Cromer Primary Surveillance Radar
- Schedule 2 Streets subject to Street Works
- Schedule 3 Public Rights of Way to be temporarily stopped up
- Schedule 4 Streets to be stopped up
- Schedule 5 Access to Works
- Schedule 6 Land in which only New Rights etc., may be acquired
2 Licensed Marine Activities – General
3 Details of Licensed Marine Activities
- 1Design parameters
- 2
- 3
- 4
- 5
- 6
- 7
- 8Phasing of the authorised scheme
- 9Notifications and inspections
- 10Aids to navigation
- 11Colouring of structures
- 12Chemicals, drilling and debris
- 13Force majeure
- 14Pre-construction plans and documentation
- 15
- 16Post-construction plans and documents
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Reporting of impact pile driving
- 22Reporting of scour and cable protection
- 23Completion of construction
2 Licensed Marine Activities – General
3 Details of Licensed Marine Activities
- 1Design parameters
- 2
- 3
- 4
- 5
- 6
- 7
- 8Phasing of the authorised scheme
- 9Notifications and inspections
- 10Aids to navigation
- 11Colouring of structures
- 12Chemicals, drilling and debris
- 13Force majeure
- 14Pre-construction plans and documentation
- 15
- 16Post-construction plans and documents
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Reporting of impact pile driving
- 22Reporting of cable and scour protection
- 23Completion of construction
2 Licensed Marine Activities – General
3 Details of Licensed Marine Activities
- 1Design parameters
- 2
- 3Phasing of the authorised scheme
- 4Notifications and inspections
- 5Aids to navigation
- 6Colouring of structures
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10
- 11Post-construction plans and documents
- 12Reporting of engaged agents, contractors and vessels
- 13Pre-construction monitoring and surveys
- 14Construction monitoring
- 15Post construction
- 16Reporting of impact pile driving
- 17Reporting of scour and cable protection
- 18Restriction on cable installation construction works
2 Licensed Marine Activities – General
3 Details of Licensed Marine Activities
- 1Design parameters
- 2
- 3Phasing of the authorised scheme
- 4Notifications and inspections
- 5Aids to navigation
- 6Colouring of structures
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10
- 11Post-construction plans and documents
- 12Reporting of engaged agents, contractors and vessels
- 13Pre-construction monitoring and surveys
- 14Construction monitoring
- 15Post construction
- 16Reporting of impact pile driving
- 17Reporting of cable protection
- 18Restriction on cable installation construction works
1 Protection for electricity, gas, water and sewerage undertakers
2 For the Protection of National Grid as Electricity and Gas Undertaker
- 12Application
- 13Interpretation
- 14
- 15Apparatus of Undertakers in stopped up streets
- 16Acquisition of land
- 17Removal of apparatus
- 18Facilities and rights for alternative apparatus
- 19Retained apparatus: protection Gas Undertakers
- 20Retained apparatus: protection Electricity Undertakers
- 21Expenses
- 22Compensation
- 23Enactments and agreements
- 24Co-operation
- 25Access
- 26Arbitration
- 27Notices
3 For the Protection of Cadent Gas Limited as Gas Undertaker
- 28Application
- 29Interpretation
- 30On Street Apparatus
- 31Apparatus of Undertakers in stopped up streets
- 32Acquisition of land
- 33Removal of apparatus
- 34Facilities and rights for alternative apparatus
- 35Retained apparatus: protection Gas Undertakers
- 36Expenses
- 37Compensation
- 38Enactments and agreements
- 39Co-operation
- 40Access
- 41Arbitration
- 42Notices
4 Protection for Operators of Electronic Communications Code Networks
5 Protection of Network Rail Infrastructure Limited
6 For the Protection of Anglian Water Services Limited
7 For the protection of the Environment Agency and drainage authorities
8 For the protection of Ørsted Hornsea Project Three (UK) Ltd