The A1 Birtley to Coal House Development Consent Order 2021
Typestatutory instrumentDate19 Jan 2021Articles122Versions held3Cited by12 documentsLast changed1 May 2021
- 10Application of the 1991 Act
- 11Power to alter layout etc. of streets
- 12Street works
- 13Construction and maintenance of new, altered or diverted streets
- 14Classification of roads etc.
- 15Temporary stopping up and restriction of use of streets
- 16Permanent stopping up and restriction of use of streets, public rights of way and private means of access
- 17Access to works
- 18Modification of Road Traffic Regulation Orders
- 19Traffic regulation
- 23Compulsory acquisition of land
- 24Compulsory acquisition of land – incorporation of the mineral code
- 25Time limit for exercise of authority to acquire land compulsorily
- 26Compulsory acquisition of rights and restrictive covenants
- 27Private rights over land
- 28Modification of Part 1 of the 1965 Act
- 29Application of the 1981 Act
- 30Acquisition of subsoil or airspace only
- 31Rights under or over streets
- 32Temporary use of land for carrying out the authorised development
- 33Temporary use of land for maintaining the authorised development
- 34Statutory undertakers
- 35Apparatus and rights of statutory undertakers in stopped up streets
- 36Recovery of costs of new connections
- 1Interpretation
- 2Time limits
- 3Detailed design – general design requirements
- 4Construction and handover environmental management plans
- 5Landscaping
- 6Contaminated land and groundwater
- 7Protected species
- 8Surface and foul water drainage
- 9Archaeological remains
- 10Traffic management
- 11Amendments to approved details
- 12Design of North Dene Footbridge
- 13Fencing
- 14Allerdene bridge replacement
- 15Primary Design Mitigation
- 16Advance site clearance works
- 17Details of construction compound
2 PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- Schedule 3 CLASSIFICATION OF ROADS ETC.
- Schedule 4 PERMANENT STOPPING UP OF STREETS, PUBLIC RIGHTS OF WAY AND PRIVATE MEANS OF ACCESS
- Schedule 5 PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
- Schedule 6 LAND IN RESPECT OF WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 8 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 9 TREES SUBJECT TO TREE PRESERVATION ORDER
- Schedule 10 SCHEDULED MONUMENTS
1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
Apparatus in stopped up streets
Facilities and rights for alternative apparatus
2 FOR THE PROTECTION OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
3 FOR THE PROTECTION OF RAILWAY INTERESTS
4 FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED
Apparatus in stopped up streets