The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020
Typestatutory instrumentDate10 Dec 2020Articles57Cited by11 documents
- 5Power to construct and maintain works
- 6Power to deviate
- 7Power to alter layout etc. of streets
- 8Power to execute street works
- 9Stopping up of streets
- 10Temporary stopping up of streets
- 11Construction and maintenance of new or altered streets
- 12Access to works
- 13Highways subject to redesignation
- 14Closure of level crossings subject to opening of new rights of way
- 15Closure of Black Horse Drove level crossing
- 16Creation and maintenance of new highways
- Schedule 1 SCHEDULED WORKS
- Schedule 2 CLOSURE OF LEVEL CROSSINGS SUBJECT TO OPENING OF NEW HIGHWAY
- Schedule 3 LAND IN WHICH PRIVATE RIGHTS OF ACCESS MAY BE ACQUIRED
- Schedule 4 REDESIGNATION OF HIGHWAYS
- Schedule 5 ACQUISITION OF LAND FOR AUTHORISED WORKS
- Schedule 6 LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED
- Schedule 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 8 STREETS SUBJECT TO ALTERATION OF LAYOUT
- Schedule 9 STREETS SUBJECT TO STREET WORKS
- Schedule 10 STREETS TO BE PERMANENTLY STOPPED UP
- Schedule 11 STREETS TO BE TEMPORARILY STOPPED UP
- Schedule 12 ACCESS TO WORKS
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.