The Silvertown Tunnel Order 2018
- 6Street works
- 7Application of the 1991 Act
- 8Construction and maintenance of new, altered or diverted streets
- 9Permanent stopping up of streets and private means of access
- 10Temporary stopping up and restriction of use of streets
- 11Access to works
- 12Agreements with street authorities
- 13Use of private roads for construction
- 19Compulsory acquisition of land
- 20Compulsory acquisition of land – incorporation of the minerals code
- 21Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily
- 22Compulsory acquisition of rights
- 23Private rights over land
- 24Power to override easements and other rights
- 25Modification of Part 1 of the 1965 Act
- 26Application of the 1981 Act
- 27Acquisition of subsoil, etc., only
- 28Rights over or under streets
- 39Application of Part 4
- 40Maintenance of the authorised development
- 41Local legislation relating to the Blackwall Tunnel
- 42Power to operate and use the tunnels
- 43Closing the tunnels
- 44Removal of motor vehicles
- 45Removal of other obstructions
- 46Dangerous goods
- 47No apparatus in the Silvertown Tunnel area without consent
- 48Byelaws relating to the Silvertown Tunnel area and the Blackwall Tunnel area
- 49Fixed penalty notices
- 50Classification of roads, etc.
- 51Operational land for purposes of the 1990 Act
- 52Restrictions on other works in the river Thames
- 58Benefit of Order
- 59Transfer of benefit of Order, etc.
- 60Application of landlord and tenant law
- 61Traffic regulation measures
- 62Deemed marine licence
- 63Defence to proceedings in respect of statutory nuisance
- 64Protective provisions
- 65Certification of documents
- 66Silvertown Tunnel Implementation Group
- 67Service of notices
- 68Arbitration
- 69Consents, agreements and approvals
- 1Interpretation
- 2Time limit for commencement of the authorised development
- 3Design principles and design review panel
- 4Detailed design of above ground buildings and structures
- 5Code of construction practice and related plans and strategies
- 6Landscaping scheme
- 7Monitoring and mitigation strategy
- 8Surface water drainage details
- 9External lighting details
- 10Signage strategy
- 11Flood risk assessment
- 12Operational noise mitigation measures
- 13Siebert Road and Westcombe Hill area noise barriers
- 14Cross-river bus services
- 15Cross-river cycle/pedestrian facilities
- 16Biodiversity action plan and mitigation strategy
- 17Contaminated land
- 18Hazardous substances – East Greenwich Gasholder site
- 19Hazardous substances – Brenntag Chemicals site
- 20Re-use of excavated material on-site
- 21Local business transitional support
2 PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- Schedule 3 PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS
- Schedule 4 LAND IN WHICH ONLY NEW RIGHTS MAY BE ACQUIRED
- Schedule 6 LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED
- Schedule 7 LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN
2 REPRESENTATIONS AND APPEALS IN RELATION TO THE REMOVAL OF MOTOR VEHICLES
- 5Penalty charge notices
- 6Representations against penalty charge notice
- 7Cancellation of penalty charge notice
- 8Rejection of representations against penalty charge notice
- 9Adjudication by an adjudicator
- 10Charge certificates
- 11Enforcement of charge certificate
- 12Invalid notices
- 13Enforcement by execution
- 14
- 15Service by post
- 16Procedure
1 CLASSIFICATION AND DESIGNATION OF GLA ROADS (TRANSPORT FOR LONDON ROAD NETWORK)
- 1A12 Blackwall Tunnel Southern Approach Southbound
- 2A12 Blackwall Tunnel Southern Approach Northbound
- 3A12 Crossover between Blackwall Tunnel Southern Approach Northbound and Southbound Carriageways
- 4Pavilion Lane (Realigned) (to Millennium Way)
- 5Pavilion Lane (Realigned) (from Millennium Way)
- 6A102 Silvertown Tunnel Southern Approach Northbound
- 7A102 Silvertown Tunnel Southern Approach Southbound
- 8A102 The Silvertown Tunnel Northbound
- 9A102 The Silvertown Tunnel Southbound
- 10A102 The Silvertown Tunnel Northern Approach Northbound
- 11A102 The Silvertown Tunnel Northern Approach Southbound
- 12A102 Silvertown Way Off-Slip (Dedicated Left Turn)
- 13A102 Tidal Basin Roundabout
- 14A102 Lower Lea Crossing Eastbound
- 15A102 Lower Lea Crossing Westbound
- 16A102 Lower Lea Crossing (Eastbound and Westbound)
- 17A102 Leamouth Circus Roundabout
- 18A102 Leamouth Road (Northbound and Southbound)
- 19A12 Blackwall Tunnel Northern Approach Southbound
- 20A12 Blackwall Tunnel Northern Approach Northbound
- 21A12 Blackwall Tunnel Southbound
- 22A12 Blackwall Tunnel Northbound
2 RE-DESIGNATION OF GLA ROAD AS A LOCAL AUTHORITY (‘BOROUGH’) ROAD
1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
3 FOR THE PROTECTION OF NATIONAL GRID
- 16Application
- 17Interpretation
- 18
- 19Apparatus of National Grid in stopped up streets
- 20Acquisition of land
- 21Removal of apparatus
- 22Facilities and rights for alternative apparatus
- 23Retained apparatus: protection of National Grid as Gas Undertaker
- 24Retained apparatus: protection of National Grid as Electricity Undertaker
- 25Protective works to buildings
- 26Expenses
- 27Indemnity
- 28Enactments and agreements
- 29Co-operation
- 30Access
- 31Arbitration
4 FOR THE PROTECTION OF THE PORT OF LONDON AUTHORITY
- 32
- 33Definitions
- 34Approval of detailed design
- 35Design of the tunnelling works
- 36As built drawings
- 37Discharges, etc.
- 38
- 39Navigational lights, buoys, etc.
- 40Directions as to lights
- 41Removal, etc. of the PLA's moorings and buoys
- 42Removal of temporary works
- 43Protective action
- 44Abandoned or decayed works
- 45Facilities for navigation
- 46Survey of riverbed
- 47Statutory functions
- 48Indemnity
- 49Compensation for temporary works
- 50Apparatus in the Silvertown Tunnel area
- 51Disposals, etc.
- 52Disputes
5 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
6 FOR THE PROTECTION OF THE LONDON BOROUGH OF NEWHAM AND THE ROYAL BOROUGH OF GREENWICH
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.