PART 4
Exempt flood risk activities: descriptions and conditions
General and interpretation
1…
Electrical cable services
2…
Service crossings below the bed of a main river
3…
Service crossings attached to the outside of existing structures over a main river
4…
Footbridges
5…
Temporary scaffolding in England
6…
Temporary dewatering in England
7…
Maintenance of raised river or sea defences
8…
Maintenance of structures within the channel of a main river
9…
Drinking bays
10…
Access platforms
11…
Outfalls
12…
Repair and protection of banks using natural materials
13…
Repair of bank slips and erosion
14…
Channel habitat structures made of natural materials
15…
Rafts for surveys
16…
Gravel-cleaning for fish-spawning beds
17…
Placement of stones or logs in a main river in England for habitat enhancement
18…
Eel pass devices
19…
Fish passage notches
20…
Removal of silt, sand and other material in England
21…
Removal of silt and sand adjacent to in-river structures in England
22…
Dredging of man-made ditches, land drains, agricultural drains and previously straightened watercourses in England
23…
Dredging of any main river in England
24…
Excavation of scrapes and shallow wetland features
25…
Raised flood defences in England
26…
Bankside wildlife refuge structures
27…
Improvement works for tracks and paths
28…