The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015
Typestatutory instrumentDate17 Feb 2015Articles242Versions held10Cited by23 documentsLast changed21 Nov 2025
- 3Development consent, etc. granted by Order
- 4Maintenance of authorised project
- 5Operation of generating stations
- 6Requirements: appeals, etc.
- 7Benefit of Order
- 8Consent to transfer benefit of Order
- 9Bizco 1 and Bizco 4 may enter certain land for purpose of construction
- 10Disapplication and modification of legislative provisions
- 11Offshore works: abandonment, decay or removal
- 12Defence to proceedings in respect of statutory nuisance
- 21Compulsory acquisition of land
- 22Compulsory acquisition of land: minerals
- 23Time limit for exercise of authority to acquire land compulsorily, etc.
- 24Compulsory acquisition of rights
- 25Private rights of way
- 26Application of Compulsory Purchase (Vesting Declarations) Act 1981
- 27Acquisition of part of certain properties
- 28Rights under or over streets
- 29Temporary use of land for carrying out authorised project
- 30Temporary use of land for maintaining authorised project
- 31Statutory undertakers
- 32Recovery of costs of new connections
- 33Application of landlord and tenant law
- 34Special category land
- 35Railway and navigation undertakings
- 36Trees subject to tree preservation orders
- 37Operational land for purposes of 1990 Act
- 38Felling or lopping of trees and removal of hedgerows
- 39Deemed licences under Marine and Coastal Access Act 2009
- 40Saving for Trinity House
- 41Crown rights
- 42Certification of plans and documents, etc.
- 43Protective provisions
- 44Arbitration
- 1Interpretation
- 2Time limits
- 3Detailed offshore design parameters
- 4
- 5
- 6
- 7Layout rules
- 8Aviation lighting
- 9
- 10Offshore decommissioning
- 11Stages of authorised development onshore
- 12Detailed design approval onshore
- 13
- 14Provision of landscaping
- 15Implementation and maintenance of landscaping
- 16Fencing and other means of enclosure
- 17Highway accesses
- 18Surface and foul water drainage
- 19
- 20Archaeology
- 21Ecological management plan
- 22Code of construction practice, etc.
- 23Construction environmental management plan
- 24Construction hours
- 25Control of noise during operational phase
- 26Control of artificial light emissions
- 27Construction-phase traffic management plan
- 28European protected species: onshore
- 29Restoration of land used temporarily for construction
- 30Interference with telecommunications
- 31Onshore decommissioning
- 32Emergency response plan
- 33Amendments to approved details
- 34Southern North Sea Special Area of Conservation
- Schedule 2 Streets subject to street works
- Schedule 3 Streets to be temporarily stopped up
- Schedule 4 Access to works
- Schedule 5 Land over which only new rights may be acquired
- 3Detailed offshore design parameters
- 4
- 5Layout rules
- 6Notifications and inspections
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10
- 11Offshore safety management
- 12Reporting of engaged agents, contractors and vessels
- 13Equipment and operation of vessels engaged in licensed activities
- 14Pre-construction monitoring
- 15Construction monitoring
- 16Post-construction surveys
- 17Post-construction maintenance plan
- 18Aids to navigation
- 19
- 20
- 21
- 22
- 23
- 24Colour of authorised scheme
- 25Amendments to plans, etc.
- 3Detailed offshore design parameters
- 4
- 5Layout rules
- 6Notifications and inspections
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10
- 11Offshore safety management
- 12Reporting of engaged agents, contractors and vessels
- 13Equipment and operation of vessels engaged in licensed activities
- 14Pre-construction monitoring
- 15Construction monitoring
- 16Post-construction surveys
- 17Post-construction maintenance plan
- 18Aids to navigation
- 19
- 20
- 21
- 22
- 23
- 24Colour of authorised scheme
- 25Amendments to plans, etc.
- 3Detailed offshore design parameters
- 4Layout rules
- 5Notifications and inspections
- 6Chemicals, drilling and debris
- 7Force majeure
- 8Pre-construction plans and documentation
- 9
- 10Offshore safety management
- 11Reporting of engaged agents, contractors and vessels
- 12Equipment and operation of vessels engaged in licensed activities
- 13Pre-construction monitoring
- 14Construction monitoring
- 15Post-construction surveys
- 16Post-construction maintenance plan
- 17Aids to navigation
- 18
- 19
- 20
- 21
- 22
- 23Colour of authorised scheme
- 24Amendments to plans, etc.
- 3Detailed offshore design parameters
- 4Layout rules
- 5Notifications and inspections
- 6Chemicals, drilling and debris
- 7Force majeure
- 8Pre-construction plans and documentation
- 9
- 10Offshore safety management
- 11Reporting of engaged agents, contractors and vessels
- 12Equipment and operation of vessels engaged in licensed activities
- 13Pre-construction monitoring
- 14Construction monitoring
- 15Post-construction surveys
- 16Post-construction maintenance plan
- 17Aids to navigation
- 18
- 19
- 20
- 21
- 22
- 23Colour of authorised scheme
- 24Amendments to plans, etc.