The Hornsea One Offshore Wind Farm Order 2014
Typestatutory instrumentDate10 Dec 2014Articles431Versions held7Cited by18 documentsLast changed28 Dec 2017
- 14Guarantees in respect of payment of compensation
- 15Compulsory acquisition of land
- 16Compulsory acquisition of rights
- 17Time limit for exercise of authority to acquire land compulsorily
- 18Private rights
- 19Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 20Acquisition of subsoil or airspace only
- 21Acquisition of part of certain properties
- 22Rights under or over streets
- 23Temporary use of land for carrying out the authorised project
- 24Temporary use of land for maintaining authorised project
- 25Statutory undertakers
- 26Recovery of costs of new connections
- 29Operational land for purposes of the 1990 Act
- 30Disapplication of legislative provisions
- 31Defence to proceedings in respect of statutory nuisance
- 32Procedure in relation to approvals etc under requirements
- 33Abatement of offshore works abandoned or decayed
- 34Transfer of benefit of Order
- 35Deemed marine licences under the Marine and Coastal Access Act 2009
- 36Disapplication of constraints on works in the Humber
- 37Saving for Trinity House
- 38Crown Rights
- 39Certification of plans etc
- 40Protection of Interests
- 41Arbitration
- 1Time limits
- 2Detailed design parameters
- 3Colour and lighting
- 4Foundation methods
- 5Archaeology above mean low water level
- 6Ecological management plan above mean low water level
- 7Code of Construction Practice
- 8Landscaping
- 9Implementation and maintenance of landscaping
- 10Decommissioning
- 11Highway accesses
- 12Contaminated land and groundwater
- 13Surface water drainage
- 14Colour and detailed design approval – electrical transmission station
- 15Prohibited access
- 16Port traffic management plan
- 17Co-operation
- 18Control of noise during operational phase
- 19Employment and skills plan
- 20North Coates airfield
- 21Requirement for written approval
- 22Amendments to approved details
- 1Time limits
- 2Detailed design parameters
- 3Colour and lighting
- 4Foundation methods
- 5Archaeology above mean low water level
- 6Ecological management plan above mean low water level
- 7Code of Construction Practice
- 8Landscaping
- 9Implementation and maintenance of landscaping
- 10Decommissioning
- 11Highway accesses
- 12Contaminated land and groundwater
- 13Surface water drainage
- 14Colour and detailed design approval – electrical transmission station
- 15Prohibited access
- 16Port traffic management plan
- 17Co-operation
- 18Control of noise during operational phase
- 19Employment and skills plan
- 20North Coates airfield
- 21Requirement for written approval
- 22Amendments to approved details
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Amendments to details
- 22Offshore Decommissioning
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Amendments to details
- 22Offshore Decommissioning
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Amendments to details
- 22Offshore Decommissioning
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Amendments to details
- 22Offshore Decommissioning
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Amendments to details
- 22Offshore Decommissioning
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Amendments to details
- 22Offshore Decommissioning
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Offshore Decommissioning
- 22Restrictions in intertidal area and Humber Estuary Special Area of Conservation
- 23Amendments to details
- 1Design parameters
- 2
- 3
- 4
- 5
- 6Notifications and inspections
- 7Aids to navigation
- 8Provision against danger to navigation
- 9Navigational Practice, Safety and Emergency Response
- 10Colour and lighting
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14
- 15
- 16Reporting of engaged agents, contractors and vessels
- 17Equipment and Operation of Vessels Engaged in Licensed Activities
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Offshore Decommissioning
- 22Restrictions in intertidal area and Humber Estuary Special Area of Conservation
- 23Amendments to details
1 Protection for Environment Agency and drainage authorities
2 Protection for Network Rail Infrastructure limited
3 Protection for operators of electronic communications code networks
4 For the protection of utility undertakers
5 For the protection of Associated British Ports
6 For the protection of Anglian Water Services limited
7 For the protection of Centrica plc
8 For the protection of VPI Immingham LLP
9 For the protection of Phillips 66 limited
10 For the protection of C.GEN Killingholme limited
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.