The Electricity and Gas (Energy Company Obligation) Order 2014
Typestatutory instrumentDate4 Dec 2014Articles62Versions held3Cited by3 documentsLast changed29 Mar 2017
- 7Determining a supplier’s obligations and minimum requirements
- 8Determining obligations for a supplier who is not a member of a group
- 9Determining obligations for a supplier who is a member of a group
- 10Determining supply
- 11Increasing a supplier's carbon emissions reduction obligation as a result of the supplier's failure to achi
- 12Achievement of carbon emissions reduction obligation
- 13A supplier's solid wall minimum requirement
- 14Achievement of carbon saving community obligation
- 15Actions in specified adjoining areas of low income
- 16Achievement of home heating cost reduction obligation
- 16aConditions to be met for heating qualifying actions completed after 31st March 2017
- 17Notifications of qualifying actions
- 18Determining the carbon saving for a qualifying action
- 19Determining the cost score for a qualifying action
- 20Determining the cost score for a qualifying boiler repair and replacement
- 21Determining the cost score for a gas fuelled qualifying boiler replacement
- 22Determining the cost score for a qualifying electric storage heater repair and replacement
- 23Determining the cost score for heating qualifying actions installed at non-gas fuelled premises
- 24Approval of an appropriate methodology for the carbon saving or cost saving attributable to a SAP scored qu
- 24aMethodology for the carbon saving or cost saving attributable to a deemed score qualifying action
- 25Attributing the carbon saving or cost score to a qualifying action
- 26Transfers of qualifying actions
- 27Surplus actions
- 28Determining the carbon saving for a surplus action
- 29Determining the cost score for a surplus action
- 30Transfers of surplus actions
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.