The Rampion Offshore Wind Farm Order 2014
Typestatutory instrumentDate16 Jul 2014Articles217Versions held7Cited by15 documentsLast changed28 Apr 2025
- Preamble
- 1Citation and commencement
- 2Interpretation
- 3Development consent etc granted by the Order
- 4Power to maintain authorised project
- 5Operation of electricity generating station
- 6Requirements, appeals etc
- 7Benefit of the Order
- 8Application and modification of legislative provisions
- 9Public rights of navigation
- 10Abatement of works abandoned or decayed
- 11Deemed marine licences under the Marine and Coastal Access Act 2009
- 12Saving for Trinity House
- 13Crown rights
- 14Defence to proceedings in respect of statutory nuisance
- 15Street works
- 16Temporary stopping up of streets
- 17Public rights of way
- 18Access to works
- 19Agreements with street authorities
- 20Discharge of water
- 21Authority to survey and investigate the land
- 22Temporary suspension of public access to access land
- 23Compulsory acquisition of land
- 24Time limit for exercise of authority to acquire land compulsorily
- 25Compulsory acquisition of rights
- 26Private rights
- 27Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 28Acquisition of subsoil only
- 29Acquisition of part of certain properties
- 30Rights under or over streets
- 31Temporary use of land for carrying out the authorised project
- 32Temporary use of land for maintaining the authorised project
- 33Statutory undertakers
- 34Recovery of costs of new connections
- 35Application of landlord and tenant law
- 36Operational land for purposes of the 1990 Act
- 37Felling or lopping of trees and removal of hedgerows
- 38Trees subject to tree preservation orders
- 39Procedure in relation to further approvals, etc
- 40Certification of plans etc
- 41Protective provisions
- 42Arbitration
- 1Time limits
- 2Detailed offshore design parameters
- 3
- 4
- 5
- 6Base port travel plan
- 7Lighting
- 8Offshore decommissioning
- 9Stages of authorised development onshore
- 10Design approval onshore
- 11Provision of landscaping
- 12Implementation and maintenance of landscaping
- 13Highway accesses
- 14Permanent highway accesses in the South Downs National Park
- 15Public rights of way
- 16National Trail in the South Downs National Park
- 17Fencing and means of enclosure
- 18Temporary fencing in the South Downs National Park
- 19Surface and foul water drainage
- 20Contaminated land and groundwater
- 21Landfill site
- 22Flood risk
- 23Archaeology
- 24Archaeology in the South Downs National Park
- 25Scheduled monument at Tottington Mount
- 26Construction environmental management plan
- 27Watercourse crossings
- 28Ecological and landscape management plan
- 29Ecological and landscape management plan for the South Downs National Park
- 30Construction health, safety and environmental plan
- 31Construction traffic management plan
- 32Construction hours
- 33External lighting and control of artificial light emissions
- 34External lighting in the South Downs National Park
- 35Control of noise during construction
- 36Control of noise during operational phase
- 37European protected species onshore
- 38European protected species within the South Downs National Park
- 39Restoration of land used temporarily for construction
- 40Restoration of land within the South Downs National Park used temporarily for construction
- 41Onshore decommissioning
- 42Amendments to approved details
- 43Consultation with local planning authority
- Schedule 2 Streets subject to street works
- Schedule 3 Footpath to be permanently stopped up
- Schedule 4 Public rights of way to be temporarily stopped up
- Schedule 5 Access to works
- Schedule 6 Temporary suspension of public access to access land
- Schedule 7 Land in which only new rights etc, may be acquired
- Schedule 9 Land of which temporary possession may be taken
- Schedule 10 Important hedgerows
- Schedule 11 Trees subject to tree preservation orders
1 For the protection of railway interests
2 For the protection of National Grid Electricity Transmission plc
- 1Application
- 2Interpretation
- 3
- 4Apparatus of protected person in stopped up streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection: electricity undertakers
- 10Expenses
- 11Indemnity
- 12Ground subsidence monitoring scheme in respect of protected person’s apparatus
- 13Enactments and agreements
- 14Co-operation
- 15Access
- 16Arbitration
- 17Transfer of agreements
3 For the protection of South Eastern Power Networks plc
4 For the protection of Southern Water Services Limited
5 For the protection of gas pipeline owners, pipeline owners and sewerage undertakers
- 1Design parameters
- 2
- 3
- 4
- 5Notifications and inspections
- 6Navigational practice, safety and emergency response
- 7Aids to navigation
- 8
- 9Chemicals, drilling and debris
- 10Force majeure
- 11Pre-construction plans and documentation
- 12
- 13Reporting of engaged agents, contractors and vessels
- 14Equipment and operation of vessels engaged in licensed activities
- 15Pre-construction monitoring and surveys
- 16Construction monitoring
- 17Post construction surveys
- 18Black bream spawning
- 19Herring spawning
- 20Restrictions on monopile foundations
- 21Monitoring of shoreline sediment morphology
- 22Decommissioning
- 1Design parameters
- 2Notifications and inspections
- 3Navigational practice, safety and emergency response
- 4Aids to navigation
- 5Chemicals, drilling and debris
- 6Force majeure
- 7Pre-construction plans and documentation
- 8
- 9Reporting of engaged agents, contractors and vessels
- 10Equipment and operation of vessels engaged in licensed activities
- 11Pre-construction monitoring and surveys
- 12Construction monitoring
- 13Post construction surveys
- 14Decommissioning
- 15Monitoring of shoreline sediment morphology
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.