Column 1 | Column 2
HLS capital works item | Maximum percentage of cost
(a)
Installation of silt traps
60% of cost
(b)
Installation of wind pumps for maintenance of water levels
80% of cost
(c)
Improvement of droves
50% of cost
(d)
Construction of water penning structures
80% of cost
(e)
Use of native seed mix in relation to the reversion of arable land
100% of cost
(f)
Major preparatory work in relation to the re-creation of heathland
100% of cost
(g)
Installation of livestock handling facilities
60% of cost
(h)
Protection of historical and archaeological features
100% of cost
(i)
Restoration of historic farm buildings
80% of cost