Column 1 | Column 2 | Column 3 | Column 4
Option | ELS options points value per unit | OELS options points value per unit | HLS options maximum payment rate per agreement year
General—
| |
Identification, recording and retention of features
3 per hectare | 3 per hectare |
Basic organic management
30 per hectare |
Field boundaries—
| |
Hedgerow management (on both sides of the hedge)
22 per 100 metres | 22 per 100 metres |
Hedgerow management (on one side of the hedge)
11 per 100 metres | 11 per 100 metres |
Enhanced hedgerow management (on both sides of the hedge)
42 per 100 metres | 42 per 100 metres |
Stone faced hedge bank management (on both sides of the hedge bank)
16 per 100 metres | 16 per 100 metres |
Stone faced hedge bank management (on one side of the hedge bank)
8 per 100 metres | 8 per 100 metres |
Ditch management (on both sides of the ditch)
24 per 100 metres | 24 per 100 metres |
Ditch management (on one side of the ditch)
8 per 100 metres | 8 per 100 metres |
Ditch management combined with hedgerow management mentioned at (a) above
38 per 100 metres | 38 per 100 metres |
Ditch management combined with hedgerow management mentioned at (b) above
26 per 100 metres | 26 per 100 metres |
Ditch management combined with hedgerow management mentioned at (c) above
56 per 100 metres | 56 per 100 metres |
Stone wall protection and maintenance
15 per 100 metres | 15 per 100 metres |
Trees and woodland—
| |
Protection of in-field trees on arable land
12 per tree | 12 per tree | £12 per tree
Protection of in-field trees on grassland
8 per tree | 8 per tree | £8 per tree
Maintenance of woodland fences
4 per 100 metres | 4 per 100 metres |
Management of land bordering woodland
380 per hectare | 380 per hectare | £380 per hectare
Historic and landscape features—
| |
Taking cultivated land in or on which archaeological features are located out of cultivation
460 per hectare | 600 per hectare | £600 per hectare
Reducing cultivation depths on land in or on which archaeological features are located
60 per hectare | 100 per hectare | £100 per hectare
Management of scrub on archaeological sites
120 per hectare | 120 per hectare | £120 per hectare
Management of grassland in or on which archaeological features are located
16 per hectare | 16 per hectare | £16 per hectare
Maintenance of traditional farm buildings
2 per square metre of ground floor area | 2 per square metre of ground floor area | £2 per square metre of ground floor area
Buffer strips—
| |
Creation (where appropriate) and maintenance of 2 metre buffer strips on cultivated land
300 per hectare | | £300 per hectare
Creation (where appropriate) and maintenance of 2 metre buffer strips on rotational land
400 per hectare | £400 per hectare
Creation (where appropriate) and maintenance of 4 metre or 6 metre buffer strips on cultivated land
400 per hectare | | £400 per hectare
Creation (where appropriate) and maintenance of 4 metre or 6 metre buffer strips on rotational land
500 per hectare | £500 per hectare
Creation (where appropriate) and maintenance of 2 metre buffer strips on intensive grassland
300 per hectare | | £300 per hectare
Creation (where appropriate) and maintenance of 2 metre buffer strips on organic grassland
400 per hectare | £400 per hectare
Creation (where appropriate) and maintenance of 4 metre or 6 metre buffer strips on intensive grassland
400 per hectare | | £400 per hectare
Creation (where appropriate) and maintenance of 4 metre or 6 metre buffer strips on organic grassland
500 per hectare | £500 per hectare
Creation (where appropriate) and maintenance of buffer strips around in-field ponds in improved grassland
400 per hectare | | £400 per hectare
Creation (where appropriate) and maintenance of buffer strips around in-field ponds in organic grassland
500 per hectare | £500 per hectare
Creation (where appropriate) and maintenance of buffer strips around in-field ponds in arable land
400 per hectare | | £400 per hectare
Creation (where appropriate) and maintenance of buffer strips around in-field ponds in rotational land
500 per hectare | £500 per hectare
Arable land—
| |
Management of field corners
400 per hectare | 500 per hectare | £500 per hectare
Establishing and maintaining plant species beneficial to wild birds on arable land
450 per hectare | 550 per hectare | £550 per hectare
Establishing and maintaining plant species beneficial to wild birds on set-aside land
85 per hectare | | £85 per hectare
Establishing and maintaining a mixture of pollen and nectar rich plants on arable land
450 per hectare | 550 per hectare | £550 per hectare
Establishing and maintaining a mixture of pollen and nectar rich plants on set-aside land
85 per hectare | | £85 per hectare
Retention of over-wintered stubbles on arable land
120 per hectare | 150 per hectare | £150 per hectare
Creation and maintenance of beetle banks
580 per hectare | 750 per hectare | £750 per hectare
Creation of skylark plots
5 per plot | 5 per plot | £5 per plot
Creation of conservation headlands
100 per hectare | | £100 per hectare
Creation of conservation headlands with no fertiliser or manure
330 per hectare | | £330 per hectare
Creation (where appropriate) and maintenance of 6 metre uncropped cultivated margin on arable land
400 per hectare | | £400 per hectare
Encouragement of a range of crop types—
| |
Under-sowing a spring-sown cereal crop with a mixture of seeds of grass and legume species
200 per hectare | 150 per hectare | £200 per hectare
Establishing and maintaining plant species beneficial to wild birds on grassland
450 per hectare | 550 per hectare | £550 per hectare
Establishing and maintaining a mixture of pollen and nectar rich plants on grassland
450 per hectare | 550 per hectare | £550 per hectare
Planting cereals for whole crop silage followed by over-wintered stubbles
230 per hectare | 250 per hectare | £250 per hectare
Planting brassica fodder crops followed by over-wintered stubbles
90 per hectare | 110 per hectare | £110 per hectare
Reduction of soil erosion—
| |
Management of cultivated land with a high risk of soil erosion
18 per hectare | 18 per hectare | £18 per hectare
Management of maize crops to reduce soil erosion
18 per hectare | 18 per hectare | £18 per hectare
Grassland outside the less favoured area—
| |
Taking corners of fields of improved grassland out of management
400 per hectare | 500 per hectare | £500 per hectare
Management of permanent grassland using low inputs
85 per hectare | 115 per hectare | £115 per hectare
Management of permanent grassland using very low inputs
150 per hectare | 180 per hectare | £180 per hectare
Management of rush pastures
150 per hectare | 180 per hectare | £180 per hectare
Stocking land with cattle and sheep
8 per hectare | 8 per hectare | £8 per hectare
Land within the less favoured area—
| |
Management of field corners
100 per hectare | 100 per hectare | £100 per hectare
Management of in-bye grassland using low inputs
35 per hectare | 35 per hectare | £35 per hectare
Management of in-bye pasture and meadows using very low inputs
60 per hectare | 60 per hectare | £60 per hectare
Management of rush pastures
60 per hectare | 60 per hectare | £60 per hectare
Establishment (where appropriate) and maintenance of rough grazing on land in parcels of less than 15 hectares
35 per hectare | 35 per hectare | £35 per hectare
Establishment (where appropriate) and maintenance of rough grazing on land in parcels of 15 hectares or more
5 per hectare | | £5 per hectare
Stocking land with cattle and sheep
8 per hectare | 8 per hectare | £8 per hectare
Preparation of land management plans—
| |
Soil management
3 per hectare | 3 per hectare | £3 per hectare
Nutrient management
2 per hectare | 2 per hectare | £2 per hectare
Manure management
2 per hectare | 2 per hectare | £2 per hectare
Crop protection management
2 per hectare | | £2 per hectare