, The Transport and Works (Applications and Objections Procedure) (England and Wales) Rule…
Changed on 11 Sep 2006
(1) | (2)
Subject-matter of application | Fee
1.Construction of a transport system or inland waterway which would involve any compulsory acquisition of land but would not involve any interference with rights of navigation.
1.For the first hectare or part hectare of the proposed works, £6,000.
For the next 49 hectares, £1,000 per hectare or part hectare.
For the next 50 hectares, £500 per hectare or part hectare.
For any additional area, £250 per hectare or part hectare.
2.Construction of a transport system or inland waterway which would not require the compulsory acquisition of land and not interefere with rights of navigation.
2.For the first hectare or part hectare of the proposed works, £4,000.
For the next 49 hectares, £500 per hectare or part hectare.
For any additional area, £100 per hectare or part hectare.
3.Construction of works any part of which would involve interference with rights of navigation, being of a description prescribed under section 4.
3.
(A)Where the works to be constructed would not form part of a transport system or , an inland waterway or a wind farm—
for the first hectare or part hectare of the proposed works, £8,000;
for the next 49 hectares, £1,500 per hectare or part hectare;
for the next 50 hectares, £750 per hectare or part hectare; and
for any additonal area, £375 per hectare or part hectare.
(B)Where the works to be constructed include works which would form part of a transport system or an inland waterway—
for works which would interfere with rights of navigation, as in column (2) of paragraph (A) above; and
for other works, as in column (2) of paragraph 1 or 2, as applicable, above.
(C) Where the works to be constructed would form part of a wind farm—
for a wind farm comprising up to 30 wind turbines, £20,000; and
for a wind farm comprising 31 or more wind turbines, £20,000 for the first 30 wind turbines plus £500 for each additional wind turbine.
4.Provision for the transfer of an undertaking.
4.£1,500.
5.Provision for any matter other than those described above.
5.£3,500.…