The Merchant Shipping (Passenger Ship Construction: Ships of Classes I, II and II(A)) Regulations 1998
The Merchant Shipping (Passenger Ship Construction: Ships of Classes I, II and II(A)) Re…
Typestatutory instrumentDate8 Oct 1998Articles93Versions held8Cited by12 documentsLast changed29 Mar 2023
- 6Application
- 7Structural strength
- 8Watertight subdivision
- 9Construction of watertight bulkheads
- 10Collision, machinery space and afterpeak bulkheads and shaft tunnels
- 11Double bottoms
- 12Weather deck
- 13Partial subdivision above the bulkhead deck
- 14Openings in watertight bulkheads
- 15Openings in the shell plating below the bulkhead deck
- 16Side and other openings above the bulkhead deck
- 17Construction and testing of watertight doors
- 18Construction and testing of watertight decks, trunks etc.
- 19Ships carrying goods vehicles and accompanying personnel (watertight doors) Requirements for ships construc
- 27Interpretation
- 28
- 29Closure of bulkheads on the ro-ro deck
- 30Supervision and reporting of closure
- 31Closure of watertight and weathertight doors in bulkheads
- 32Watertight integrity from the bulkhead deck to spaces below
- 33Opening of doors in an emergency
- 34Entries in official log book
- 35Listing of loading and unloading berths
- 36Written instructions regarding the closure of doors above the bulkhead deck
- 37Intact stability standard
- 38Inclining, lightweight survey and stability information
- 39Subdivision lines
- 40Draughts marks
- 41Automatic draught gauge system
- 42Recording of draught, trim and freeboard prior to departure
- 43Calculation of stability prior to departure
- 44Stability in the damaged condition Requirements for ships constructed before 29 April 1990
- 45Stability in the damaged condition Requirements for ships constructed on or after 29th April 1990
- 46Requirements for ro-ro passenger ships which carry 400 persons or more
- 47Exhibition of damage control plans
- 52Application
- 53General
- 54Main source of electrical power and main switchboards
- 55Lighting systems Requirements for ships constructed on or after 1st September 1984
- 56Emergency and transitional sources of electrical power
- 57Distribution systems
- 58Location and construction of electric cable
- 59General precautions against shock, fire and other hazards
- 60Electrical equipment in hazardous areas and spaces
- 61Spare parts and tools
- 62General
- 63Machinery
- 64Means of manoeuvring and going astern
- 65Boilers and other pressure vessels
- 66Boiler feed systems
- 67Steam pipe systems
- 68Air pressure systems
- 69Cooling systems
- 70Oil fuel installations
- 71Oil systems for lubricating, heating, cooling and control
- 72Machinery controls
- 73Steering gear
- 74Ventilating systems in machinery spaces Requirements for ships constructed on or after 1st September 1984
- 75Protection against noise Requirements for ships constructed on or after 1st September 1984
- 76Communication between navigating bridge and machinery space
- 77Engineers' alarm
- 78Spare gear
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.