, The Environmental Authorisations (Scotland) Regulations 2018

In forcesince 1 Nov 2025

Column 1

Activity

Column 2

Rules

1.

| The operation of any weir that— | The weir must not impede the free passage of salmon and sea trout during periods within which, in the absence of the weir, the flow of the river would be at a level expected to enable migration.

(a)

| is not capable of being operated to control the water level upstream of the weir,

(b)

| does not result in the creation of a height differential between the upstream and downstream water surfaces of more than one metre, and

(c)

| was constructed before 1st April 2006.

2.

| The abstraction of less than 10 m³ of water in any one day. | (a) | There must be a means of demonstrating that the abstraction is less than 10 m³ in any one day, such as a means of measuring the rate of the abstraction or a means of demonstrating that the maximum volume that could be abstracted cannot exceed 10 m³ in any one day,

(b)

| water leakage must be kept to a minimum by ensuring all pipe work, storage tanks and other equipment associated with the abstraction and use of the water are maintained in a state of good repair,

(c)

| the activity must not be located within 50 metres of any existing well, spring or borehole used for a water supply.

3.

| The construction, extension or operation of any well, borehole or other works by which water may be abstracted, if such works are— | (a) | The construction and operation of—

(i)

| subject to paragraphs (b) and (c), the well or borehole, and

(ii)

| any other works,

must be such as to—

(aa)

| prevent the introduction to the water environment of water of a different chemical composition, or the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

(bb)

| prevent the mixing of groundwater of different chemical compositions in the water environment,

(cc)

| prevent the flow of water between two hydro-geologically separate aquifers,

(a)

| not intended for the purpose of abstraction, | (b) | drilling fluids may be introduced into the well or borehole if necessary to facilitate the drilling of the well or borehole provided this does not result in harm to the water environment,

(b)

| intended for the abstraction of less than 10 m³ of water in any one day,

(c)

| intended for the abstraction of less than 150 m³ of water in any period of one year, and the purpose of the abstraction is either— | (c) | potable water may be introduced into the well or borehole to test the hydraulic properties of the aquifer,

(d)

|

when the well or borehole is no longer required, it must be back filled or sealed to the extent necessary to—

(i)

avoid loss of groundwater from any aquifer, and

(ii)

avoid the introduction, into any body of groundwater, of—

(aa)

any substances or heat which may give rise to harm to the water environment, or

(bb)

water of a different chemical composition,

(i)

| to test for the yield of the borehole or well or the hydraulic properties of the aquifer, or

(ii)

| to sample the water quality,

(d)

| intended to dewater one or more excavations at— | (e) | the depth of any well or borehole beneath the surface of the ground must not exceed 200 metres,

(i)

| a construction site for roads, buildings, pipelines, or other built developments, or

(ii)

| a site at which the maintenance of such developments is being undertaken, or

(f)

| the borehole must not be constructed within 50 metres of an existing well or borehole for the supply of water without the consent of the owner of the existing well or borehole.

(e)

| intended for the purpose of undertaking activity 17.

4.

| The abstraction from a borehole, and any subsequent discharge of the abstracted water, if the total volume of water abstracted is less than 150 m³ in any period of one year and the purpose of the abstraction is either— | (a) |

The abstraction must not cause the introduction to any body of groundwater of—

(i)

any substances or heat which may give rise to harm to the water environment, or

(ii)

water of a different chemical composition,

(a)

| to test the yield of the borehole or well or the hydraulic properties of the aquifer, or | (b) | when the borehole is not being used for abstraction, it must be back filled or sealed to the extent necessary to avoid loss of groundwater from any aquifer.

(b)

| to sample the water quality.

5.

| The dredging of a river, burn or ditch that— |

(a)

| has an average bed width of less than one metre along the stretch to be worked, and | (a) | Vegetation on any bank of the river, burn or ditch may be removed or modified only to the extent that the works cannot reasonably be carried out without such removal or modification,

(b)

| has been artificially straightened or canalised along the length which is to be worked. | (b) | any vegetation removed must not be disposed of into the river, burn or ditch,

(c)

| the activity must not result in the widening of the bed width of the river, burn or ditch,

(d)

| all reasonable steps must be taken to prevent the transport of sediments or other matter disturbed by the works into waters beyond the worked stretch,

(e)

| any works in the wetted part of the river, burn or ditch must not be undertaken during periods in which fish are likely to be spawning in the river, burn or ditch nor in the period between any such spawning and the subsequent emergence of the juvenile fish,

(f)

| all reasonable steps must be taken to avoid increased erosion of the bed or banks of the river, burn or ditch as a result of the works,

(g)

| the bed of the worked stretch must be graded at a shallow angle to tie in with the bed level upstream and downstream and there must be no steps or sudden changes in the angle of the bed slope,

(h)

| the removed sediment must not be left on the banks such that its placement heightens the banks.

6.

| The installation of— |

(a)

| a crossing where no part of the crossing is on the bed or banks of a river, burn, ditch or loch, | (a) | Vegetation on any bank of the river, burn, ditch or loch may be removed or modified only to the extent that the works cannot be reasonably be carried out without such removal or modification,

(b)

| an outfall which discharges into a river, burn, ditch or loch. | (b) | any vegetation removed must not be disposed of into the river, burn, ditch or loch,

(c)

| the works must not prevent the free passage of migratory fish,

(d)

| the works must not result in the narrowing of the channel width nor the heightening of either bank,

(e)

| any works in the wetted part of any river, burn, ditch or loch must not be undertaken during periods in which fish are likely to be spawning in the river, burn, ditch or loch nor in the period between any such spawning and the subsequent emergence of the juvenile fish,

(f)

| all reasonable steps must be taken to ensure that the works do not result in increased erosion of the bed or banks of the river, burn, ditch or loch,

(g)

| the works must not result in the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

(h)

| any outfall and associated works must be designed and installed to be no larger than is necessary for the proper operation of the outfall, and in any case must not extend more than 20 metres along the length of the river, burn, ditch or loch.

7.

| The installation and removal of— | (a) | Any temporary crossing, temporary structure or temporary works—

(a)

temporary crossings and temporary structures in a river, burn, ditch or loch, or | (i) must be removed as soon as is reasonably practicable and in any event within a period of 12 months beginning with the date on which its installation commences,

(b)

any temporary works associated with the undertaking of any other activity specified in this Chapter of this schedule or for the purpose of maintaining an existing man-made structure in a river, burn, ditch or loch, | (ii) must not prevent the free passage of migratory fish,

(iii)

must not cause harm to fish,

(iv)

must not cause harm to freshwater pearl mussels, and

(v)

must not result in the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

unless the installation or removal is authorised by a registration or permit under these Regulations.

(b)

| the installation and removal of any temporary crossing, temporary structure or temporary works within the wetted part of the river, burn, ditch or loch must not take place during periods in which fish are likely to be spawning in that part of the river, burn, ditch or loch nor during the period between any such spawning and the subsequent emergence of the juvenile fish,

(c)

| vegetation on any bank of the river, burn, ditch or loch may be removed or modified only to the extent that the works cannot reasonably be carried out without such removal or modification,

(d)

| any vegetation removed must not be disposed of into the river, burn, ditch or loch,

(e)

| all reasonable steps must be taken to ensure that the works do not result in increased erosion of the bed or banks of the river, burn, ditch or loch.

8.

| Bank works by revetment or bank reprofiling of a river, burn, ditch or loch. | (a) | All reasonable steps must be taken to ensure that the works do not result in increased erosion of either bank of the river, burn, ditch or loch,

(b)

| the works must not result in the destabilisation of the bed of the river, burn, ditch or loch upstream or downstream of the works,

(c)

| vegetation on any bank of the river, burn, ditch or loch may be removed or modified only to the extent that the works cannot reasonably be carried out without such removal or modification,

(d)

| any vegetation removed must not be disposed of into the river, burn, ditch or loch,

(e)

| revetments must be constructed from one or more of the following: vegetation, biodegradable geotextiles, wood other than wood treated with preservatives or non-grouted stone rip-rap,

(f)

| the length of any revetment or bank reprofiling must be no more than 10 metres or one channel width, whichever is greater,

(g)

| if wood or stone rip-rap is used for a revetment, the wood or rip-rap must only be placed at the toe of the bank,

(h)

| except for the purpose of repairing an existing revetment, no bank protection works must be undertaken within 5 channel widths or 50 metres (whichever is the greater) of any existing bank protection works on any bank of the river, burn, ditch or loch,

(i)

| the works must not result in the heightening or lowering of either bank top,

(j)

| the works must not result in the introduction of any substances or heat to the water environment which may give rise to harm to the water environment.

9.

| Operating any vehicle, plant or other equipment in or near any surface water or wetland for the purpose of undertaking any other activity specified in this Chapter of this schedule or for the purpose of maintaining an existing man-made structure in or near any surface water or wetland. | (a) | Any vehicles, plant or other equipment must only operate in water where it is impracticable for them to operate on dry land,

(b)

| the refuelling of vehicles, plant or other equipment must be undertaken at least 10 metres from any—

(i)

| river, burn, canal, ditch or loch, as measured from the top of the bank,

(ii)

| wetland,

(iii)

| transitional water or coastal water, as measured from the shoreline,

(c)

| any static plant or equipment used within 10 metres of any—

(i)

| river, burn, canal, ditch or loch, as measured from the top of the bank,

(ii)

| wetland,

(iii)

| transitional water or coastal water, as measured from the shoreline,

must be positioned on a suitably sized and maintained impervious drip tray with a capacity equal to 110% of the capacity of the fuel tank which is supplying the plant or equipment,

(d)

| any vehicle, plant or other equipment used in or near surface water or wetland must not leak any oil,

(e)

| the washing of vehicles, plant or other equipment must be undertaken at least 10 metres away from any—

(i)

| river, burn, ditch or loch, as measured from the top of the bank,

(ii)

| wetland, or

(iii)

| transitional water or coastal water, as measured from the shoreline,

(f)

| vehicles, plant or other equipment must not be operated in the wetted part of a river, burn, ditch or loch during periods in which fish are likely to be spawning in the river, burn, ditch or loch nor during the period between any such spawning and the subsequent emergence of the juvenile fish,

(g)

| vehicles, plant or equipment must not be operated in any part of a river, burn, ditch or loch if there is a reasonable likelihood that, within 50 metres of such an operation, there are freshwater pearl mussels,

(h)

| during forestry operations the operator must not operate machinery in any surface water or wetland,

(i)

| following the operation of the vehicle, plant or other machinery, any damage caused by the operation to the bed and banks of the surface water or wetland must be repaired, including re-establishing vegetation on any areas of bare earth on the banks resulting from the operation, either by covering the area with grass turfs or lining them with a biodegradable geotextile and seeding.

10A. The discharge of water run-off from a surface water drainage system to the water environment from buildings, roads other than water-bound roads, yards, or any other built development constructed before 1 April 2007, with the exception of run-off from any motorway or trunk road where— | (a) | All reasonable steps must be taken to ensure that the discharge does not result in the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

(b)

| the discharge must not—

(i)

| contain any trade effluent or domestic sewage,

(i)

| any one outfall serves a length of road greater than 1 kilometre, and | (ii) | result in visible discolouration, iridescence, foaming or sewage fungus in the water environment, or

(ii)

| the footprint of the road or its associated infrastructure is enlarged or otherwise altered on or after 1 April 2007.

(iii)

| contain any water run-off from a construction site,

(c)

| the discharge must not result in the destabilisation of the banks or bed of the receiving surface water,

(d)

| all facilities with which the surface water drainage system is equipped to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment, including oil interceptors, silt traps and SUD system attenuation, settlement and treatment facilities, must be maintained in good order and repair,

(e)

| all reasonable steps must be taken to ensure that any matter liable to block, obstruct, or otherwise impair the ability of the surface water drainage system to avoid the introduction of any substances or heat to the water environment, which may give rise to harm to the water environment, is prevented from entering the drainage system.

10B. The discharge of water run-off from a surface water drainage system to the water environment from buildings, roads other than water-bound roads, yards, or any other built development constructed on or after 1 April 2007, with the exception of run-off from— | (a) | All reasonable steps must be taken to ensure that the discharge does not result in the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

(b)

| the discharge must not—

(i)

| contain any trade effluent or domestic sewage,

(i)

| land of more than 30 hectares which is used for residential premises, | (ii) | result in visible discolouration, iridescence, foaming or sewage fungus in the water environment, or

(ii)

| industrial estates, | (iii) | contain any water run-off from a construction site,

(iii)

| land used as a motorised vehicle parking area with more than 1,000 parking spaces, | (c) | the discharge must not result in the destabilisation of the banks or bed of the receiving surface water,

(iv)

| motorways and trunk roads where any one outfall serves a length of road greater than 1 kilometre. | (d) | the development must be drained by a SUD system equipped to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment, unless—

(i)

| the run-off is from a development that is a single dwelling and its curtilage, or

(ii)

| the discharge is to coastal water,

(e)

| the discharge must not contain any water run-off from—

(i)

| any fuel delivery areas constructed on or after 1 April 2007, or any areas where vehicles, plant and equipment are refuelled constructed on or after 1 April 2007,

(ii)

| vehicle loading or unloading bays constructed on or after 1 April 2007 where potentially polluting matter is handled, or

(iii)

| oil and chemical storage handling and delivery areas constructed on or after 1 April 2007,

(f)

| all facilities with which the surface water drainage system is equipped to avoid the introduction of any substances or heat which may give rise to harm to the water environment, including oil interceptors, silt traps and SUD system attenuation, settlement and treatment facilities, must be maintained in good order and repair,

(g)

| all reasonable steps must be taken to ensure that any matter liable to block, obstruct, or otherwise impair the ability of the surface water drainage system to avoid the introduction of any substances or heat to the water environment, which may give rise to harm to the water environment, is prevented from entering the drainage system.

10C. The discharge of water run-off from a quarry or borrow pit constructed on or after 1 January 2022. | (a) | All reasonable steps must be taken to ensure that the discharge does not result in the introduction of any substances or heat to the water environment which may give rise to any harm to the water environment,

(b)

| the discharge must not—

(i)

| contain any trade effluent or domestic sewage, or

(ii)

| result in visible discolouration, iridescence, foaming or sewage fungus in the water environment,

(c)

| the discharge must not result in the destabilisation of the banks or bed of the receiving surface water,

(d)

| the discharge must not contain any water run-off from—

(i)

| any fuel delivery areas constructed on or after 1 April 2007, or any areas where vehicles, plant and equipment are refuelled constructed on or after 1 April 2007,

(ii)

| vehicle loading or unloading bays constructed on or after 1 April 2007 where potentially polluting matter is handled, or

(iii)

| oil and chemical storage handling and delivery areas constructed on or after 1 April 2007,

(e)

| the quarry or borrow pit must be drained by a SUD system or equivalent system equipped to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

(f)

| all facilities with which the surface water drainage system is equipped to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment, including oil interceptors, silt traps and SUD system attenuation, settlement and treatment facilities, must be maintained in good order and repair,

(g)

| all reasonable steps must be taken to ensure that any matter liable to block, obstruct, or otherwise impair the ability of the surface water drainage system to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment is prevented from entering the drainage system.

10D. The discharge of water run-off from a construction site to the water environment where the site, including any constructed access tracks, does not— | (a) | All reasonable steps must be taken to ensure that the discharge does not introduce any substances or heat to the water environment which may give rise to harm to the water environment,

(i)

| exceed 4 hectares, | (b) | the discharge must not—

(ii)

| contain a road or track length in excess of 5 kilometres, or | (i) | contain any trade effluent or domestic sewage, or

(iii)

| include any area of more than 1 hectare or any length of more than 500 metres on ground with a slope in excess of 25 degrees. | (ii) | result in visible discolouration, iridescence, foaming or sewage fungus in the water environment,

(c)

| the discharge must not result in the destabilisation of the banks or bed of the receiving surface water,

(d)

| the discharge must not contain any water run-off from any built developments, unless during construction those developments are drained by a SUD system or equivalent system equipped to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment,

(e)

| the discharge must not contain any water run-off from—

(i)

| any fuel delivery areas constructed on or after 1 April 2007, or any areas where vehicles, plant and equipment are refuelled constructed on or after 1 April 2007,

(ii)

| vehicle loading or unloading bays constructed on or after 1 April 2007 where potentially environmentally harmful matter is handled, or

(iii)

| oil and chemical storage handling and delivery areas constructed on or after 1 April 2007,

(f)

| all parts of a construction site on which—

(i)

| operations first commenced on or after 1 June 2018, and

(ii)

| any works are to be undertaken, or any vehicles are to be operated or parked,

must be drained by a surface water drainage system with capacity to accommodate the maximum volume of run-off that would reasonably be expected to occur from that land during the period of construction,

(g)

| all facilities with which the surface water drainage system is equipped to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment, including oil interceptors, silt traps and SUD system attenuation, settlement and treatment facilities, must be maintained in good order and repair,

(h)

| all reasonable steps must be taken to ensure that any matter liable to block, obstruct, or otherwise impair the ability of the surface water drainage system to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment is prevented from entering the drainage system.

11.

| Discharge into a surface water drainage system. | (a) | Oil, paint, paint thinners, pesticides, detergents, disinfectants or any other substances or heat which may give rise to harm to the water environment must not be disposed of into a surface water drainage system or onto any surface that drains into a surface water drainage system,

(b)

| any matter liable to block, obstruct, or otherwise impair the ability of the surface water drainage system to avoid the introduction of any substances or heat to the water environment which may give rise to harm to the water environment must not be disposed of into a surface water drainage system or onto a surface that drains into a surface water drainage system,

(c)

| domestic sewage or trade effluent must not be discharged into any surface water drainage system,