, The Pollution Prevention and Control (Scotland) Regulations 2012 (revoked)

In forcesince 1 Nov 2025

…

Changed on 1 Nov 2025

(a) Disposal of non-hazardous waste at an installation with a capacity exceeding 50 tonnes per day by one or more of— (i) biological treatment, (ii) physico-chemical treatment, (iii) pre-treatment of waste for incineration or co-incineration, (iv) treatment of slags and ashes, (v) treatment in shredders of metal waste, including waste electrical and electronics equipment and end-of-life vehicles and their components. (b) Recovery or a mix of recovery and disposal of non-hazardous waste at an installation with a capacity exceeding 75 tonnes per day (or 100 tonnes per day if the only waste treatment activity is anaerobic digestion) by one or more of— (i) biological treatment, (ii) pre-treatment of waste for incineration or co-incineration, (iii) treatment of slags or ashes, (iv) treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.…

  1. 1 Nov 2025 – todayin force
  2. 30 Oct 2014 – 1 Nov 2025earlier wording
  3. 7 Jan 2013 – 30 Oct 2014earlier wording