, The Pollution Prevention and Control (Scotland) Regulations 2012 (revoked)

In forcesince 1 Nov 2025

…

Changed on 1 Nov 2025

(a) Unless falling within any other description in any Part A of this Schedule, the crushing, grinding or other size reduction (other than the cutting of stone), or the grading, screening or heating of any designated mineral or mineral product, except where the operation of the activity is unlikely to result in the release into the air of particulate matter. (b) Any of the following activities, unless carried on at an exempt location:— (i) crushing, grinding or otherwise breaking up coal or coke or any other coal product, (ii) screening, grading or mixing coal, or coke or any other coal product, (iii) loading or unloading petroleum coke, coal, coke or any other coal product, except unloading on retail sale. (c) The crushing, grinding or other size reduction, with machinery designed for that purpose, of bricks, tiles or concrete. (d) Screening the product of any such activity as is described in paragraph (c). (e) Coating road stone with tar or bitumen. (f) Loading, unloading, or storing pulverised fuel ash in bulk prior to further transportation in bulk. (g) The fusion of calcinated bauxite for the production of artificial corundum.…

  1. 1 Nov 2025 – todayin force
  2. 7 Jan 2013 – 1 Nov 2025earlier wording
  3. 20 Dec 2012 – 7 Jan 2013earlier wording