Land type | Year 1 | Year 2 | Year 3 | Year 4 | Year 5

Conversion

Arable | £220 | £220 | £60 | £60 | £60

Improved grassland | £105 | £105 | £50 | £50 | £50

Fruit & vegetable | £300 | £300 | £60 | £60 | £60

Unimproved grassland/ rough grazing | £5 | £5 | £5 | £5 | £5

Maintenance

Arable | £60 | £60 | £60 | £60 | £60

Improved grassland | £50 | £50 | £50 | £50 | £50

Fruit & vegetable | £60 | £60 | £60 | £60 | £60

Unimproved grassland/ rough grazing | £5 | £5 | £5 | £5 | £5

Table B

Woodland Type | Minimum wood or individual block size planted per year (hectares) | Composition | Minimum stocking density per hectare at year 5 or when considered to be ‘established’

Productive conifer woodland (low cost) | 5.0 |

–

up to 85% conifers but predominantly spruce

–

at least 5% broadleaves

–

up to 10% open ground

Spruce – 2500

Broadleaves – 1100

Productive conifer woodland (high cost) | 5.0 |

–

up to 85% other conifers e.g. Scots Pine, Douglas Fir, Larch

–

at least 5% broadleaves

–

up to 10% open ground

Pine – 3000

Douglas Fir, Larch – 2000

Broadleaves – 1100

Productive broadleaved woodland | 2.0 |

–

at least 85% productive broadleaves e.g. Oak, Beech, Sycamore, Ash

–

up to 5% other broadleaves

–

up to 10% open ground

Oak, Beech – 3100

Sycamore, Ash – 2500

Other Broadleaf – 1100

Native and riparian woodland (planting) | 0.25 |

–

at least 75% species native to the locality and appropriate to the site

–

up to 25% open ground

1100

Native and riparian woodland (natural regeneration) | 0.25 |

–

at least 75% species native to the locality

–

up to 25% open ground

1100

Mixed conifer / broadleaf woodland | 0.25 |

–

at least 80% mixed conifer and broadleaves, the latter being at least half of the planted area.

–

up to 20% open ground

Conifer – 2500

Broadleaves – 1100

Native woodland in the Northern and Western Isles | 0.25 |

at least 60% native species

up to 15% mixed broadleaved

up to 25% open ground

3000

Mixed conifer/broadleaved woodland in Central Scotland | 0.25 |

up to 20% mixed conifer species

up to 80% mixed broadleaved

up to 20% open ground

Conifers – 2500

Broadleaved - 2100

Table C

Woodland Type | Establishment £/ha * | Maintenance Standard Cost Rate £/ha/year **

*

Paid as a lump sum on completion of planting.

**

Paid as an annual payment for a period of 5 years. Trees must be satisfactorily ‘established’ within 10 years of planting. Only payable where planting has occurred on agricultural land or abandoned agricultural land (i.e. at least 50% of a woodland type must be on agricultural land and/or abandoned agricultural land to be eligible for the maintenance payments).

Productive conifer woodland (low cost) | 1724 | 161.39

Productive conifer woodland (high cost) | 2064 | 186.40

Productive broadleaved woodland | 3317 | 229.79

Native and riparian (planting model) | 2802 | 218.20

Native and riparian (natural regeneration model) | 905 | 101.60

Mixed conifer/broadleaf woodland | 3063 | 222.40

Native woodland in the Northern and Western Isles | 5200 | 360

Mixed conifer/broadleaved woodland in Central Scotland | 5000 | 300

The term ‘established’ means that trees must be present to the minimum stocking densities specified, healthy, and in a condition capable of continued growth given no further weeding but subject to normal ongoing maintenance operations such as protection from inappropriate grazing by wild or domestic animals.

An additional establishment premium for using genetically improved planting material is available as follows:

Categories of genetically improved planting material | £ per hectare |

Sitka spruce seed orchard material that falls within the tested category in terms of regulation 4 of the Forest Reproductive Material (Great Britain) Regulations 2002 | 50 |

Sitka spruce vegetatively propagated tested ‘family mixture’ material derived from controlled cross-pollination. | 150 |

Table D

Standard Costs for Forestry Operations/Capital Items

Column 1

Column 2

Item

Standard Cost

Fell/extract dangerous trees | £200 per tree

Manual brashing | £0.35 per tree

High pruning | £1.30 per tree

Badger gates installed in fence lines which are cutting across an established badger run | £110 per gate

Respace natural regeneration | £600 per hectare

Early pruning of trees | £375 per hectare

High pruning of trees | £660 per hectare

Woodland thinning | £520 per hectare

Removal of tree crop to waste 3-6 metres high | £1,100 per hectare

Woodland clearance - felling of waste | £975 per hectare

Woodland clearance - felling and extraction | £1375 per hectare

Seedling tree removal | £35 per hectare

Chipping/mulching of tree debris and brash | £500 per hectare

Restructuring with Caledonian Scots pine | £411.64 per hectare

Restructuring with diverse conifers | £411.64 per hectare

Restructuring with mixed broadleaves | £1,030.14 per hectare

Restructuring with native broadleaves | £1,100 per hectare

Restructuring with mixed conifer and broadleaves | £595.89 per hectare

Woodland deer impact reduction | £30 per hectare for deer control during the first 5 years of a Deer Management Plan

Forest plan preparation | £20 per hectare for first 200 hectares, £5 per hectare thereafter with a minimum payment of £400 and a maximum payment of £15,000

Dead wood management | £40 per hectare

Stock fence | £4 per metre

Enhancing/modifying a stock fence in black grouse and capercaillie core areas | £2 per metre

New deer fence | £7.25 per metre

Upgrading stock to deer fence | £2.75 per metre

Scare or temporary fencing | £1.50 per metre

Rabbit proofing – existing or new stock/deer fence | £1.90 per metre

Enhancing/modifying a deer fence in black grouse and capercaillie core areas | £5 per metre

Conversion of deer fence to stock fence in black grouse and capercaillie core areas | £2 per metre

Fence removal | £2 per metre

Gate for stock fence | £100 each

Gate for deer fence | £170 each

Ditch/drain blocking with plastic piling dams: Small ditches (up to 0.5 metres wide and deep) | £60 per dam

Ditch/drain blocking with plastic piling dams: Medium ditches (between 0.5 and 1 metre wide and deep) | £120 per dam

Ditch/drain blocking with plastic piling dams: Large ditches (between 1 and 2 metres wide and 0.5 and 1 metre deep) | £280 per dam

Peat dam | £0.26 per metre of drain or furrow blocked with peat dams. Minimum payment £300

Small scale tree and shrub planting (on a site not exceeding 0.25 hectares) | £2 per tree or shrub

Provision of bat and bird boxes | £15 per box

Primary treatment of bracken | £200/hectare of infested land

Eradication of scrub/woody vegetation: Light vegetation | £600/hectare

Eradication of scrub/woody vegetation: Intermediate vegetation | £850/hectare

Eradication of scrub/woody vegetation: Heavy vegetation | £1250/hectare

Removal from site of the cut shrub/woody vegetation: Light vegetation | £500/hectare

Removal from site of the cut shrub/woody vegetation: Intermediate vegetation | £1050/hectare

Removal from site of the cut shrub/woody vegetation: Heavy vegetation | £1450/hectare

Provision of water troughs to replace traditional watering points | £195 each

Installation of water supply pipe to water trough or pasture pump | £3 per metre of pipe laid

Water trough pump: cattle operated pasture or nose pump | £180 per installed pump

Stock bridge for bog management:

Small bridge

Large bridge (for ditch wider than 1.5 metres)

£170 per bridge

£620 per bridge

Heather management (in black grouse and Capercaillie core areas) | £250/hectare

Manual eradication of rhododendron:

Light infestation/easy access

Medium infestation/access

Difficult access

£4,500 per hectare of infested land

£6,100 per hectare of infested land

£9,500 per hectare of infested land

Mechanised eradication of rhododendron:

Light infestation/easy access

Medium infestation/access

Difficult access

£1,800 per hectare of infested land

£2,400 per hectare of infested land

£2,900 per hectare of infested land

Chemical eradication of rhododendron by foliar or stem injection | £1,500 per hectare of infested land

Self-closing/kissing gate for non-vehicular access | £350 each

Stile | £55 each

Building/restoring drystane or flagstone dykes | £17.50 per square metre

Table E –

Actual Cost Capital Items

Item Column

Column 2

Applicability

Column 3

Payment

Capital works for SSSI Sites (which are high nature value areas) and European sites, which enhance the public amenity value of these features | Only available in exceptional circumstances where additional action or effort is required over and above the standard cost capital items, to maintain or bring the qualifying interests of SSSIs and Natura sites into favourable condition. Beneficiaries must provide justification of why the standard cost capital items and rates are not appropriate and provide details of the work required and the associated costs. | Up to 100% of actual costs

Control of rhododendron in geographical areas covered by a regional control strategy for this invasive non-native species in all native and ancient woodlands and in woodlands affected by Phytophthora ramorum (P. ramorum) | Only available in exceptional circumstances where additional action or effort is required over and above the two standard cost items for the eradication of rhododendron. | Up to 100% of actual costs

Beneficiaries must provide justification of why standard cost capital items and rates are not appropriate and provide details of the work required and the associated costs. |

Changed on 15 Mar 2011

Native woodland in the Northern and Western Isles | 0.25 | at least 60% native species up to 15% mixed broadleaved up to 25% open ground 3000 Mixed conifer/broadleaved woodland in Central Scotland | 0.25 | up to 20% mixed conifer species up to 80% mixed broadleaved up to 20% open ground Conifers – 2500 Broadleaved - 2100

Native woodland in the Northern and Western Isles | 5200 | 360 Mixed conifer/broadleaved woodland in Central Scotland | 5000 | 300

Standard Costs Forfor Forestry Operations/ Capital Items Column 1 | Column 2 Item | Standard Cost

Early pruning of trees | £250375 per hectare High pruning of trees | £400660 per hectare Pre commercial and non commercial woodland Woodland thinning | £150520 per hectare Removal of tree crop to waste 3 – -6 metres high | £7501,100 per hectare Woodland clearance benefiting raised bog/blanket bog - felling of waste | £975 per hectare Woodland clearance benefiting raised bog/blanket bog – - felling and extraction | £1375 per hectare

Small scale woodland thinning | £300 per hectare

Restructuring with mixed conifer and broadleaves | £595.89 per hectare

Conversion of deer fence to stock fence in black grouse and capercaillecapercaillie core areas | £2 per metre

Ditch/drain blocking with plastic piling dams: Small ditches (up to 0.5 metres wide and deep) | £60 per dam Ditch/drain blocking with plastic piling dams: Medium ditches (between 0.5 and 1 metre wide and deep) | £120 per dam Ditch/drain blocking with plastic piling dams: Large ditches (between 1 and 2 metres wide and 0.5 and 1 metre deep) | £280 per dam

Heather restoration (in Black Grouse core areas) | £250 per hectare Provision of bat and bird boxes | £15 per box.

Peat dam | £0.26 per metre of moor grip to be blocked with peat dams. Minimum payment £300.

Stock bridge for bog management: | Small bridge | £170 per bridge Large bridge (for ditch wider than 1.5m) | 5 metres) £170 per bridge £620 per bridge

Manual eradiationeradication of rhododendron | £3700/: Light infestation/easy access Medium infestation/access Difficult access £4,500 per hectare of infested land £6,100 per hectare of infested land £9,500 per hectare of infested land Mechanised (and/or chemical) eradication of rhododendron: Light infestation/easy access Medium infestation/access Difficult access £1,800 per hectare of infested land £2,400 per hectare of infested land £2,900 per hectare of infested land Chemical eradication of rhododendron | £1750/by foliar or stem injection | £1,500 per hectare of infested land Self-closing/kissing gate for non-vehicular access | £350 each Stile | £55 each Building/restoring drystane or flagstone dykes | £17.50 per square metre

Operations required for Capital works for SSSI Sites of Special Scientific Interest (SSSI(which are high nature value areas) and NaturaEuropean sites to help bring their special feature into favourable condition, which enhance the public amenity value of these features | Only available in exceptional circumstances where additional action or effort is required over and above the standard cost capital items, to maintain or bring the qualifying interests of SSSIs and Natura sites into favourable condition. Beneficiaries must provide justification of why the standard cost capital items and rates are not appropriate and provide details of the work required and the associated costs. | Up to 100% of actual costs Control of rhododendron in geographical areas covered by a regional control strategy for this invasive non-native species and in all native and ancient woodlands and in woodlands affected by Phytophthora ramorum (P. ramorum) | Only available in exceptional circumstances where additional action or effort is required over and above the two standard cost items for the eradication of rhododendron. | Up to 100% of actual costs

  1. 15 Mar 2011 – 12 Jun 2015earlier wording
  2. 18 Dec 2009 – 15 Mar 2011earlier wording
  3. 7 Nov 2009 – 18 Dec 2009earlier wording
  4. 26 Jun 2009 – 7 Nov 2009earlier wording
  5. 29 Mar 2008 – 26 Jun 2009earlier wording
  6. 6 Mar 2008 – 29 Mar 2008earlier wording