Recital 81, Regulation (EU) 2024/1789

In forcesince 13 Jun 2024

To facilitate energy system integration, harness synergies and support overall system efficiency, the ENNOH, the ENTSO for Electricity and the ENTSO for Gas should cooperate closely in Union-level integrated network planning. That cooperation should cover the preparation of the joint scenarios for electricity, hydrogen and natural gas, the coordinated infrastructure gap reports, the consistent draft methodologies for energy system wide cost-benefit analysis and the integrated model pursuant to Articles 11, 12 and 13 of Regulation (EU) 2022/869. To make that cooperation efficient, the ENNOH, the ENTSO for Electricity and the ENTSO for Gas should set up common working groups preparing those deliverables. During the transitional period until 1 January 2027, the ENTSO for Gas should develop the 2026 Union-wide network development plan for hydrogen. To that end the ENTSO for Gas should fully involve hydrogen transmission network operators and the ENNOH as soon as the ENNOH is established. The 2026 Union-wide network development plan for hydrogen should consist of two separate chapters, one for hydrogen and one for natural gas. The ENNOH should develop the 2028 Union-wide network development plan for hydrogen in line with the Union-level integrated network planning pursuant to this Regulation.