It may be appropriate for electricity generation installations that are intended to make use of geological storage permitted under Directive 2009/31/EC of the European Parliament and of the Council [Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide and amending Council Directive 85/337/EEC, European Parliament and Council Directives 2000/60/EC, 2001/80/EC, 2004/35/EC, 2006/12/EC, 2008/1/EC and Regulation (EC) No 1013/2006 (OJ L 140, 5.6.2009, p. 114).] to be located in places where the recovery of waste heat, through high-efficiency cogeneration or by supplying a district heating or cooling network, is not cost-effective. Member States should therefore be able to exempt those installations from the obligation to carry out a cost-benefit analysis for providing the installation with equipment allowing the recovery of waste heat by means of a high-efficiency cogeneration unit. It should also be possible to exempt peak-load and back-up electricity generation installations which are planned to operate under 1500 operating hours per year as a rolling average over a period of five years from the requirement to also provide heat.
Recital 102, Directive (EU) 2023/1791
In forcesince 13 Sep 2023
Regulation (EC) No 1013/2006 of the European Parliament and of the Council of 14 June 20…Law
- celex=31985L0337
- num:eu=1985/337
- num:eu=2000/60 (several documents carry this name)
- num:eu=2008/1
- num:eu=2009/31 (several documents carry this name)