71 Sub-Annex 6b, Regulation (EU) 2017/1151

No longer in force

This Sub-Annex 6b defines the specific provisions regarding the correction of CO2 test results for tolerances against the target speed and distance.

This Sub-Annex 6b applies to pure ICE vehicles only.

2.1.

The actual/measured vehicle speed (vmi; km/h) coming from the roller speed of the chassis dynamometer shall be sampled with a measurement frequency of 10 Hz together with the actual time that corresponds to the actual speed.

2.2.

The target speed (vi; km/h) between time points in Tables A1/1 to A1/12 in Sub-Annex 1 shall be determined by a linear interpolation method at a frequency of 10 Hz.

The power and the forces at the wheels from the target and actual/measured speed shall be calculated by applying the following equations:

F if 0 f 1

V i V i 1

2 f 2

V i V i 1 2

4 TM m r a iP iF i

V i V i 1

3,62 0,001F mif 0 f 1

Vm i Vm i 1

2 f 2

Vm i Vm i 1 2

4 TM m r a miP miF mi

Vm i Vm i 1

3,62 0,001a i

V i V i 1

3,6 t i t i 1a mi

Vm i Vm i 1

3,6 t i t i 1

where:

Fiis the target driving force during the period from (i – 1) to (i), N;

Fmiis the actual/measured driving force during the period from (i – 1) to (i), N;

Piis the target power during the period from (i – 1) to (i), kW;

Pmiis the actual/measured power during the period from (i – 1) to (i), kW;

f0, f1, f2are the road load coefficients from Sub-Annex 4, N, N/(km/h), N/(km/h)2;

Viis the target speed at time (i); km/h;

Vmiis the actual/measured speed at time (i); km/h;

TMis the test mass of the vehicle, kg;

mris the equivalent effective mass of rotating components in accordance with paragraph 2.5.1. of Sub-Annex 4, kg;

aiis the target acceleration during the period from (i-1) to (i), m/s2;

amiis the actual/measured acceleration during the period from (i – 1) to (i), m/s2;

tiis the time, s.

3.2.

In the next step an initial POVERRUN,1 is calculated using the following equation:

POVERRUN,1 = – 0,02 × PRATED

where:

POVERRUN,1is the initial overrun power, kW;

PRATEDis the rated vehicle power, kW.

3.3.

All calculated Pi and Pmi values that are below POVERRUN,1 shall be set to POVERRUN,1 in order to exclude negative values not relevant for the CO2 emissions.

3.4.

The Pm,j values shall be calculated for each individual phase of the WLTC using the following equation:

P m,j

t endt 0 P mi n

where:

Pm,jis the average actual/measured power of the considered phase j, kW;

Pmiis the actual/measured power during the period from (i – 1) to (i), kW;

t0is the time at the beginning of the considered phase j, s;

tendis the time at the end of the considered phase j, s;

nis the number of time steps in the considered phase;

jis the index number for the considered phase.

3.5.

The average RCB corrected CO2 mass emissions (g/km) for each phase of the applicable WLTC shall be expressed in units g/s using the following equation:

M CO2,jM CO2,RCB,j

d m,j

t j

where:

MCO2,jis the average CO2 mass emission of phase j, g/s;

MCO2,RCB,jis the CO2 mass emission from step 1 of Table A7/1 of Sub-Annex 7 for the considered WLTC phase j corrected in accordance with Appendix 2 to Sub-Annex 6, and with the requirement of applying the RCB correction without considering the correction criterion c;

dm,jis the actually driven distance of the considered phase j, km;

tjis the duration of considered phase j, s.

3.6.

In the next step these CO2 mass emissions (g/s) for each phase of the WLTC shall be correlated to the average Pm,j1 values calculated in accordance with paragraph 3.4. of this Sub-Annex 6b.

The best fit of the data shall be calculated using the least square regression method. An example for this regression line (Veline line) is shown in Figure A6b /1.

3.7.

The vehicle specific Veline equation-1 calculated from paragraph 3.6. of this Sub-Annex 6b defines the correlation between CO2 emissions in g/s for the considered phase j and the average measured power at the wheel for the same phase j and is expressed with the following equation:

MCO2,j = (kv,1 × Pm,j1) + Dv,1

where:

MCO2,jis the average CO2 mass emission of phase j, g/s;

Pm,j1is the average actual/measured power of the considered phase j calculated using POVERRUN,1, kW;

kv,1is the slope of the Veline equation-1, g CO2/kWs;

Dv,1is the constant of the Veline equation-1, g CO2/s.

3.8.

In the next step, a second POVERRUN,2 is calculated following the equation:

POVERRUN,2 = – Dv,1/ kv,1

where:

POVERRUN,2is the second overrun power, kW;

kv,1is the slope of the Veline equation-1, g CO2/kWs;

Dv,1is the constant of the Veline equation-1, g CO2/s.

3.9.

All calculated Pi and Pmi values from paragraph 3.1. of this Sub-Annex 6b that are below POVERRUN,2 shall be set to POVERRUN,2 in order to exclude negative values not relevant for the CO2 emissions.

3.10.

The Pm,j2 values shall be computed again for each individual phase of the WLTC using the equations from paragraph 3.4. of this Sub-Annex 6b.

3.11.

New vehicle specific Veline equation-2 shall be computed using the least square regression method described in paragraph 3.6. of this Sub-Annex 6b. The Veline equation-2 is expressed with the following equation:

MCO2,j = (kv,2 × Pm,j2) + Dv,2

where:

MCO2,jis the average CO2 mass emission of phase j, g/s;

Pm,j2is the average actual/measured power of the considered phase j calculated using POVERRUN,2, kW;

kv,2is the slope of the Veline equation-2, g CO2/kWs;

Dv,2is the constant of the Veline equation-2, g CO2/s.

3.12.

In the next step, the Pi,j values coming from the target speed profile shall be calculated for each individual phase of the WLTC using the following equation:

P i,j2

t endt 0 P i,2 n

where:

Pi,j2is the average target power of the considered phase j calculated using POVERRUN,2, kW;

Pi,2is the target power during the period from (i – 1) to (i) calculated using POVERRUN,2, kW;

t0is the time at the beginning of the considered phase j, s;

tendis the time at the end of the considered phase j, s;

nis the number of time steps in the considered phase;

jis the index number for the considered WLTC phase.

3.13.

Delta in CO2 mass emissions of period j expressed in g/s is then calculated following the equation:

ΔCO2,j = kv,2 × (Pi,j2 – Pm,j2)

where:

ΔCO2,jis the delta in CO2 mass emissions of period j expressed, g/s;

kv,2is the slope of the Veline equation-2, g CO2/kWs;

Pi,j2is the average target power of the considered period j calculated using POVERRUN,2, kW;

Pm,j2is the average actual/measured power of the considered period j calculated using POVERRUN,2, kW;

jis the considered period j and it can be the cycle phase or the total cycle.

3.14.

The final distance and speed corrected CO2 mass emissions of period j is calculated following the equation:

M CO2,j,2bΔCO2,j M CO2,j,1

d m,j

t j

t j d i,j

where:

MCO2,j,2,bis distance and speed corrected CO2 mass emissions of period j, g/km;

MCO2,j,1is CO2 mass emissions of period j of step 1, see Table A7/1 in Sub-Annex 7, g/km;

ΔCO2,jis the delta in CO2 mass emissions of period j expressed, g/s;

tjis the duration of considered period j, s;

dm,jis the actually driven distance of the considered phase j, km;

di,jis the target distance of the considered period j, km;

jis the considered period j, which can either be the cycle phase or the total cycle.

Changed on 1 Jan 2019

1.1. This Appendix Sub-Annex 6b defines the method and required instrumentation to determine the REESS current and the REESS voltage of NOVC-HEVs, OVC-HEVs, PEVs and NOVC-FCHVs. 1.2. Measurement of REESS current and REESS voltage shall start at the same time as the test starts and shall end immediately after the vehicle has finished the test. 1.3. The REESS current and the REESS voltage of each phase specific provisions regarding the correction of CO2 test results for tolerances against the target speed and distance. This Sub-Annex 6b applies to pure ICE vehicles only. 2.1. The actual/measured vehicle speed (vmi; km/h) coming from the roller speed of the chassis dynamometer shall be sampled with a measurement frequency of 10 Hz together with the actual time that corresponds to the actual speed. 2.2. The target speed (vi; km/h) between time points in Tables A1/1 to A1/12 in Sub-Annex 1 shall be determined. 1.4. A list of the instrumentation used by the manufacturer to measure REESS voltage and current (including instrument manufacturer, model number, serial number, last calibration dates (where applicable)) during: (a) the Type 1 test according to paragraph 3 of this Sub-Annex, (b) the procedure to determine the correction coefficients according to Appendix 2 of this by a linear interpolation method at a frequency of 10 Hz. The power and the forces at the wheels from the target and actual/measured speed shall be calculated by applying the following equations: F if 0 f 1 V i V i 1 2 f 2 V i V i 1 2 4 TM m r a iP iF i V i V i 1 3,62 0,001F mif 0 f 1 Vm i Vm i 1 2 f 2 Vm i Vm i 1 2 4 TM m r a miP miF mi Vm i Vm i 1 3,62 0,001a i V i V i 1 3,6 t i t i 1a mi Vm i Vm i 1 3,6 t i t i 1 where: Fiis the target driving force during the period from (i – 1) to (i), N; Fmiis the actual/measured driving force during the period from (i – 1) to (i), N; Piis the target power during the period from (i – 1) to (i), kW; Pmiis the actual/measured power during the period from (i – 1) to (i), kW; f0, f1, f2are the road load coefficients from Sub-Annex (where applicable), (c) the ATCT as specified in Sub-Annex 6a shall be provided to the approval authority. REESS depletion is considered as a negative current. 2.1.1. The REESS current(s) shall be 4, N, N/(km/h), N/(km/h)2; Viis the target speed at time (i); km/h; Vmiis the actual/measured speed at time (i); km/h; TMis the test mass of the vehicle, kg; mris the equivalent effective mass of rotating components in accordance with paragraph 2.5.1. of Sub-Annex 4, kg; aiis the target acceleration during the period from (i-1) to (i), m/s2; amiis the actual/measured acceleration during the tests using a clamp-on or closed type current transducer. The current measurement system shall fulfil the requirements specified in Table A8/1 of this Sub-Annex. The current transducer(s) period from (i – 1) to (i), m/s2; tiis the time, s. 3.2. In the next step an initial POVERRUN,1 is calculated using the following equation: POVERRUN,1 = – 0,02 × PRATED where: POVERRUN,1is the initial overrun power, kW; PRATEDis the rated vehicle power, kW. 3.3. All calculated Pi and Pmi values that are below POVERRUN,1 shall be capable of handling the peak currents at engine starts and temperature conditions at the point of measurement. 2.1.2. Current transducersset to POVERRUN,1 in order to exclude negative values not relevant for the CO2 emissions. 3.4. The Pm,j values shall be fitted to any calculated for each individual phase of the REESS on one WLTC using the following equation: P m,j t endt 0 P mi n where: Pm,jis the average actual/measured power of the cables connected directly to the REESS and shall include the total REESS current. In case of shielded wires, appropriate methods shall be applied in accordance with the approval authority. In order to easily measure the REESS current considered phase j, kW; Pmiis the actual/measured power during the period from (i – 1) to (i), kW; t0is the time at the beginning of the considered phase j, s; tendis the time at the end of the considered phase j, s; nis the number of time steps in the considered phase; jis the index number for the considered phase. 3.5. The average RCB corrected CO2 mass emissions (g/km) for each phase of the applicable WLTC shall be expressed in units g/s using external measuring equipment, the manufacturer should provide appropriate, safe and accessible connection points in the vehicle. If that is not feasible, the manufacturer is obliged to support the approval authority in connecting a current transducer to one the following equation: M CO2,jM CO2,RCB,j d m,j t j where: MCO2,jis the average CO2 mass emission of phase j, g/s; MCO2,RCB,jis the CO2 mass emission from step 1 of Table A7/1 of Sub-Annex 7 for the considered WLTC phase j corrected in accordance with Appendix 2 to Sub-Annex 6, and with the requirement of applying the RCB correction without considering the correction criterion c; dm,jis the actually driven distance of the considered phase j, km; tjis the duration of considered phase j, s. 3.6. In the next step these CO2 mass emissions (g/s) for each phase of the cables directly connected WLTC shall be correlated to the REESS in the manner described above inaverage Pm,j1 values calculated in accordance with paragraph 3.4. of this paragraph. 2.1.3. The current transducer output shall be sampled with a minimum frequency of 20 Hz. The Sub-Annex 6b. The best fit of the data shall be calculated using the least square regression method. An example for this regression line (Veline line) is shown in Figure A6b /1. 3.7. The vehicle specific Veline equation-1 calculated from paragraph 3.6. of this Sub-Annex 6b defines the correlation between CO2 emissions in g/s for the considered phase j and the average measured current shall be integrated over time, yielding the power at the wheel for the same phase j and is expressed with the following equation: MCO2,j = (kv,1 × Pm,j1) + Dv,1 where: MCO2,jis the average CO2 mass emission of phase j, g/s; Pm,j1is the average actual/measured value of Q, expressed in ampere-hours Ah. The integration may be done in the current measurement system. As an alternative to paragraph 2.1. of this Appendix, the manufacturer may use the on-board current measurement data. The accuracy of these data power of the considered phase j calculated using POVERRUN,1, kW; kv,1is the slope of the Veline equation-1, g CO2/kWs; Dv,1is the constant of the Veline equation-1, g CO2/s. 3.8. In the next step, a second POVERRUN,2 is calculated following the equation: POVERRUN,2 = – Dv,1/ kv,1 where: POVERRUN,2is the second overrun power, kW; kv,1is the slope of the Veline equation-1, g CO2/kWs; Dv,1is the constant of the Veline equation-1, g CO2/s. 3.9. All calculated Pi and Pmi values from paragraph 3.1. of this Sub-Annex 6b that are below POVERRUN,2 shall be demonstrated to the approval authority. During the tests described in set to POVERRUN,2 in order to exclude negative values not relevant for the CO2 emissions. 3.10. The Pm,j2 values shall be computed again for each individual phase of the WLTC using the equations from paragraph 3.4. of this Sub-Annex, the REESS voltage 6b. 3.11. New vehicle specific Veline equation-2 shall be measured with the equipment and accuracy requirements specifiedcomputed using the least square regression method described in paragraph 1.13.6. of this Sub-Annex. To measure the REESS voltage using external measuring equipment, the manufacturers shall support the approval authority by providing REESS voltage measurement points. For NOVC-HEVs, NOVC-FCHVs and OVC-HEVs, instead of 6b. The Veline equation-2 is expressed with the following equation: MCO2,j = (kv,2 × Pm,j2) + Dv,2 where: MCO2,jis the average CO2 mass emission of phase j, g/s; Pm,j2is the average actual/measured power of the considered phase j calculated using POVERRUN,2, kW; kv,2is the slope of the Veline equation-2, g CO2/kWs; Dv,2is the constant of the Veline equation-2, g CO2/s. 3.12. In the next step, the Pi,j values coming from the target speed profile shall be calculated for each individual phase of the WLTC using the measured REESS voltage according to paragraph 3.1. of this Appendix, the nominal voltage of the REESS determined according to DIN EN 60050-482 may be used. As an alternative to paragraph 3.1. and 3.2. of this Appendix, the manufacturer may use the on-board voltage measurement data. The accuracy of these data shall be demonstrated to the approval authorityfollowing equation: P i,j2 t endt 0 P i,2 n where: Pi,j2is the average target power of the considered phase j calculated using POVERRUN,2, kW; Pi,2is the target power during the period from (i – 1) to (i) calculated using POVERRUN,2, kW; t0is the time at the beginning of the considered phase j, s; tendis the time at the end of the considered phase j, s; nis the number of time steps in the considered phase; jis the index number for the considered WLTC phase. 3.13. Delta in CO2 mass emissions of period j expressed in g/s is then calculated following the equation: ΔCO2,j = kv,2 × (Pi,j2 – Pm,j2) where: ΔCO2,jis the delta in CO2 mass emissions of period j expressed, g/s; kv,2is the slope of the Veline equation-2, g CO2/kWs; Pi,j2is the average target power of the considered period j calculated using POVERRUN,2, kW; Pm,j2is the average actual/measured power of the considered period j calculated using POVERRUN,2, kW; jis the considered period j and it can be the cycle phase or the total cycle. 3.14. The final distance and speed corrected CO2 mass emissions of period j is calculated following the equation: M CO2,j,2bΔCO2,j M CO2,j,1 d m,j t j t j d i,j where: MCO2,j,2,bis distance and speed corrected CO2 mass emissions of period j, g/km; MCO2,j,1is CO2 mass emissions of period j of step 1, see Table A7/1 in Sub-Annex 7, g/km; ΔCO2,jis the delta in CO2 mass emissions of period j expressed, g/s; tjis the duration of considered period j, s; dm,jis the actually driven distance of the considered phase j, km; di,jis the target distance of the considered period j, km; jis the considered period j, which can either be the cycle phase or the total cycle.

  1. 1 Jan 2019 – 1 Sep 2023earlier wording
  2. 1 Jun 2017 – 1 Jan 2019earlier wording