1.1.
This Appendix defines the specific provisions regarding testing a vehicle equipped with periodically regenerating systems as defined in paragraph 3.8.1. of this Annex.
1.2.
During cycles where regeneration occurs, emission standards need not apply. If a periodic regeneration occurs at least once per Type 1 test and has already occurred at least once during vehicle preparation or the distance between two successive periodic regenerations is more than 4000 km of driving repeated Type 1 tests, it does not require a special test procedure. In this case, this Appendix does not apply and a Ki factor of 1,0 shall be used.
1.3.
The provisions of this Appendix shall apply for the purposes of PM measurements only and not PN measurements.
1.4.
At the request of the manufacturer, and with approval of the approval authority, the test procedure specific to periodically regenerating systems need not apply to a regenerative device if the manufacturer provides data demonstrating that, during cycles where regeneration occurs, emissions remain below the emissions limits for the relevant vehicle category. In this case, a fixed Ki value of 1,05 shall be used for CO2 and fuel consumption.
1.5.
At the request of the manufacturer and with the agreement of the approval authority the Extra High phase may be excluded for determining the regenerative factor Ki for Class 2 and Class 3 vehicles.
The test vehicle shall be capable of inhibiting or permitting the regeneration process provided that this operation has no effect on original engine calibrations. Prevention of regeneration is only permitted during loading of the regeneration system and during the preconditioning cycles. It is not permitted during the measurement of emissions during the regeneration phase. The emission test shall be carried out with the unchanged, original equipment manufacturer's (OEM) control unit. At the request of the manufacturer and with agreement of the approval authority, an ‘engineering control unit’ which has no effect on original engine calibrations may be used during Ki determination.
2.1.1.
The arithmetic average emissions between regeneration events and during loading of the regenerative device shall be determined from the arithmetic mean of several approximately equidistant (if more than two) Type 1 tests. As an alternative, the manufacturer may provide data to show that the emissions remain constant (± 15 per cent) on WLTCs between regeneration events. In this case, the emissions measured during the Type 1 test may be used. In any other case, emissions measurements for at least two Type 1 cycles shall be completed: one immediately after regeneration (before new loading) and one as close as possible prior to a regeneration phase. All emissions measurements shall be carried out in accordance with this Sub-Annex and all calculations shall be carried out in accordance with paragraph 3. of this Appendix.
2.1.2.
The loading process and Ki determination shall be made during the Type 1 driving cycle on a chassis dynamometer or on an engine test bench using an equivalent test cycle. These cycles may be run continuously (i.e. without the need to switch the engine off between cycles). After any number of completed cycles, the vehicle may be removed from the chassis dynamometer and the test continued at a later time. Upon request of the manufacturer and with approval of the approval authority, a manufacturer may develop an alternative procedure and demonstrate its equivalency, including filter temperature, loading quantity and distance driven. This may be done on an engine bench or on a chassis dynamometer.
2.1.3.
The number of cycles D between two WLTCs where regeneration events occur, the number of cycles over which emission measurements are made n and mass emissions measurement M′sij for each compound i over each cycle j shall be included in all relevant test sheets.
2.2.1.
Preparation of the vehicle, if required, for the emissions test during a regeneration phase, may be completed using the preconditioning cycles in paragraph 2.6. of this Sub-Annex or equivalent engine test bench cycles, depending on the loading procedure chosen in paragraph 2.1.2. of this Appendix.
2.2.2.
The test and vehicle conditions for the Type 1 test described in this Annex apply before the first valid emission test is carried out.
2.2.3.
Regeneration shall not occur during the preparation of the vehicle. This may be ensured by one of the following methods:
2.2.3.1. A ‘dummy’ regenerating system or partial system may be fitted for the preconditioning cycles.
2.2.3.2. Any other method agreed between the manufacturer and the approval authority.
2.2.4.
A cold start exhaust emissions test including a regeneration process shall be performed in accordance with the applicable WLTC.
2.2.5.
If the regeneration process requires more than one WLTC, each WLTC shall be completed. Use of a single particulate sample filter for multiple cycles required to complete regeneration is permissible.
If more than one WLTC is required, subsequent WLTC(s) shall be driven immediately, without switching the engine off, until complete regeneration has been achieved. In the case that the number of gaseous emission bags required for the multiple cycles would exceed the number of bags available, the time necessary to set up a new test shall be as short as possible. The engine shall not be switched off during this period.
2.2.6.
The emission values during regeneration Mri for each compound i shall be calculated in accordance with paragraph 3. of this Appendix. The number of applicable test cycles d measured for complete regeneration shall be included in all relevant test sheets.
Msi
nj1M′sijn for n ≥ 1
Mri
dj1M′rijd for d ≥ 1
MpiMsi DMri dDd
where for each compound i considered:
M′sijare the mass emissions of compound i over test cycle j without regeneration, g/km;
M′rijare the mass emissions of compound i over test cycle j during regeneration, g/km (if d > 1, the first WLTC test shall be run cold and subsequent cycles hot);
Msiare the mean mass emissions of compound i without regeneration, g/km;
Mriare the mean mass emissions of compound i during regeneration, g/km;
Mpiare the mean mass emissions of compound i, g/km;
nis the number of test cycles, between cycles where regenerative events occur, during which emissions measurements on Type 1 WLTCs are made, ≥ 1;
dis the number of complete applicable test cycles required for regeneration;
Dis the number of complete applicable test cycles between two cycles where regeneration events occur.
The calculation of Mpi is shown graphically in Figure A6.App1/1.
3.1.1.
Calculation of the regeneration factor Ki for each compound i considered.
The manufacturer may elect to determine for each compound independently either additive offsets or multiplicative factors.
Ki factorKiMpiMsi
Ki offsetKi = Mpi – Msi
Msi, Mpi and Ki results, and the manufacturer's choice of type of factor shall be recorded. The Ki result shall be included in all relevant test reports. Msi, Mpi and Ki results shall be included in all relevant test sheets.
Ki may be determined following the completion of a single regeneration sequence comprising measurements before, during and after regeneration events as shown in Figure A6.App1/1.
The following shall be calculated for one Type 1 operation cycle for criteria emissions and for CO2 emissions. The CO2 emissions used for that calculation shall be from the result of step 3 described in Table A7/1 of Sub-Annex 7.
Msik
nkj1M′sik,jnk for nj≥ 1
Mrik
dkj1M′rik,jdk for d ≥ 1
Msi
xk1Msik Dk
xk1DkMri
xk1Mrik dk
xk1dkMpiMsi
xk1Dk Mri
xk1dk
xk1 Dk dk
Mpi
xk1 Msik Dk Mrik dk
xk1 Dk dk
Ki factorKiMpiMsi
Ki offsetKi = Mpi – Msi
where:
Msiare the mean mass emissions of all events k of compound i without regeneration, g/km;
Mriare the mean mass emissions of all events k of compound i during regeneration, g/km;
Mpiare the mean mass emission of all events k of compound i, g/km;
Msikare the mean mass emissions of event k of compound i without regeneration, g/km;
Mrikare the mean mass emissions of event k of compound i during regeneration, g/km;
M′sik,jare the mass emissions of event k of compound i in g/km without regeneration measured at point j where 1 ≤ j ≤ nk, g/km;
M′rik,jare the mass emissions of event k of compound i during regeneration (when j > 1, the first Type 1 test is run cold, and subsequent cycles are hot) measured at test cycle j where 1 ≤ j ≤ dk, g/km;
nkare the number of complete test cycles of event k, between two cycles where regenerative phases occur, during which emissions measurements (Type 1 WLTCs or equivalent engine test bench cycles) are made, ≥ 2;
dkis the number of complete applicable test cycles of event k required for complete regeneration;
Dkis the number of complete applicable test cycles of event k between two cycles where regenerative phases occur;
xis the number of complete regeneration events.
The calculation of Mpi is shown graphically in Figure A6.App1/2.
The calculation of Ki for multiple periodically regenerating systems is only possible after a certain number of regeneration events for each system.
After performing the complete procedure (A to B, see Figure A6.App1/2), the original starting condition A should be reached again.
3.3.
Ki factors (multiplicative or additive) shall be rounded to four decimal places based on the physical unit of the emission standard value.