The study is far from meeting these requirements. First, following a request for information sent by the Commission in 2011, the authorities had to make corrections to the data used in the study. The corrections consisted in the increase of the costs for transmission sites by about 65 %, as well as of the number of transmission sites that were actually needed to guarantee the expected coverage. JCCM argued that even with these new figures, the outcome of the comparison between terrestrial and satellite transmission technologies would not change. In fact, however, when taking these new figures into account the cost advantage of the DTT technology was diminished, or, in some scenarios, even turned around into a cost advantage for the satellite solution. This already shows that the results of the study are not robust. These flaws should have been evident to the authorities at the time if they had exercised sufficient diligence.
157 5. LEGAL ASSESSMENT › 5.3. COMPATIBILITY ASSESSMENT › 5.3.2. Article 107(3)(c) TFEU › 5.3.2.2. Well-designed aid › Assessment, Decision_act (EU) 2016/1385
In forcesince 1 Oct 2014