This TSI concerns the energy subsystem and part of the maintenance subsystem of the Union rail system in accordance with Article 1 of Directive (EU) 2016/797.
The energy and the maintenance subsystems are defined respectively in points 2.2 and 2.8 of Annex II to Directive (EU) 2016/797.
The technical scope of this TSI is further defined in Article 2 of this Regulation.
The geographical scope of this TSI is defined in Article 2(4) of this Regulation.
In accordance with Article 4(3) of Directive (EU) 2016/797, this TSI:
indicates its intended scope (section 2);
lays down essential requirements for the energy and part of the maintenance subsystems (section 3);
establishes the functional and technical specifications to be met by the energy and part of the maintenance subsystems and its interfaces vis-à-vis other subsystems (section 4);
specifies the interoperability constituents and interfaces which must be covered by European specifications, including European standards, which are necessary to achieve interoperability within the Union rail system (section 5);
states, in each case under consideration, which procedures are to be used in order to assess the conformity or the suitability for use of the interoperability constituents, on the one hand, or the EC verification of the subsystems, on the other hand (section 6);
indicates the strategy for implementing this TSI (section 7);
indicates, for the staff concerned, the professional qualifications and health and safety conditions at work required for the operation and maintenance of the energy subsystem, as well as for the implementation of this TSI (section 4);
indicates the provisions applicable to the existing energy subsystem, in particular in the event of upgrading and renewal and, in such cases, the modification work which requires an application for a new authorisation;
indicates the parameters of energy subsystem to be checked by the railway undertaking and the procedures to be applied to check those parameters after the delivery of the vehicle authorisation for placing on the market and before the first use of the vehicle to ensure compatibility between vehicles and the routes on which they are to be operated.
In accordance with Article 4(5) of the Directive (EU) 2016/797, provisions for specific cases are indicated in Section 7.
Requirements in this TSI are valid for all track gauge systems within the scope of this TSI, unless a paragraph refers to specific track gauge systems or to specific nominal track gauges.
This TSI covers all fixed installations necessary to achieve interoperability that are required to supply traction energy to a train.
The energy subsystem consists of:
(a)substationsconnected on the primary side to the high-voltage grid, with transformation of the high-voltage to a voltage and/or conversion to a traction power supply system suitable for the trains. On the secondary side, substations are connected to the railway contact line system;
(b)sectioning locationselectrical equipment located at intermediate locations between substations to supply and parallel contact lines and to provide protection, isolation and auxiliary supplies;
(c)separation sectionsequipment required to provide the transition between electrically different systems or between different phases of the same electrical system;
(d)contact line systema system that distributes the electrical energy to the trains running on the route and transmits it to the trains by means of current collectors. The contact line system is also equipped with manually or remotely controlled disconnectors which are required to isolate sections or groups of the contact line system according to operational necessity. Feeder lines are also part of the contact line system;
(e)return circuitall conductors which form the intended path for the traction return current. Therefore, so far as this aspect is concerned, the return circuit is part of the energy subsystem and has an interface with the infrastructure subsystem.
In accordance with Annex II, Section 2.2 of Directive (EU) 2016/797, the trackside of the electricity consumption measuring system, referred to in this TSI as on-ground energy data collecting system, is set out in point 4.2.17 of this TSI.
The objective of the traction power supply system is to supply every train with power in order to meet the planned timetable.
Basic parameters for traction power supply system are set out in point 4.2.
The objective is to ensure reliable and continuous power transfer from the traction power supply system to the rolling stock. The interaction between the overhead contact line and the pantograph is an important aspect of interoperability.
Basic parameters referring to the geometry of the OCL and quality of current collection are set out in point 4.2.
The energy subsystem interfaces with other subsystems of the rail system in order to achieve the envisaged performance. These subsystems are listed below:
Rolling stock;
Infrastructure;
Trackside control command and signalling;
On-board control command and signalling;
Operation and traffic management.
Point 4.3 of this TSI sets out the functional and technical specification of these interfaces.
Requirements relating to the energy subsystem for safety in railway tunnels are set out in the TSI relating to Safety in railway tunnels.
The following table indicates basic parameters of this TSI and their correspondence to the essential requirements as set out and numbered in Annex III of Directive (EU) 2016/797.
TSI point | Title of TSI point | Safety | R&A | Health | Environ-mental protection | Tech. Compati-bility | Accessibility
4.2.3 | Voltage and frequency | — | — | — | — |
1.5
2.2.3
—
4.2.4 | Traction power supply performance | — | — | — | — |
1.5
2.2.3
—
4.2.5 | Current at standstill | — | — | — | — |
1.5
2.2.3
—
4.2.6 | Regenerative braking | — | — | — |
1.4.1
1.4.3
1.5
2.2.3
—
4.2.7 | Electrical protection coordination arrangements | 2.2.1 | — | — | — | 1.5 | —
4.2.8 | Harmonics and dynamic effects for AC traction power supply systems | — | — | — |
1.4.1
1.4.3
1.5 | —
4.2.9 | Geometry of the overhead contact line | — | — | — | — |
1.5
2.2.3
—
4.2.10 | Pantograph gauge | — | — | — | — |
1.5
2.2.3
—
4.2.11 | Mean contact force | — | — | — | — |
1.5
2.2.3
—
4.2.12 | Dynamic behaviour and quality of current collection | — | — | — |
1.4.1
2.2.2
1.5
2.2.3
—
4.2.13 | Pantograph spacing for overhead contact line design | — | — | — | — |
1.5
2.2.3
—
4.2.14 | Contact wire material | — | — |
1.3.1
1.3.2
1.4.1 |
1.5
2.2.3
—
4.2.15 | Phase separation sections | 2.2.1 | — | — |
1.4.1
1.4.3
1.5
2.2.3
—
4.2.16 | System separation sections | 2.2.1 | — | — |
1.4.1
1.4.3
1.5
2.2.3
—
4.2.17 | On-ground energy data collecting system | — | — | — | — | 1.5 | —
4.2.18 | Protective provisions against electric shock |
1.1.1
1.1.3
2.2.1
| — |
1.4.1
1.4.3
2.2.2
1.5 | —
4.4 | Operating rules | 2.2.1 | — | — | — | 1.5 | —
4.5 | Maintenance rules |
1.1.1
2.2.1
1.2 | — | — |
1.5
2.2.3
—
4.6 | Professional qualifications | 2.2.1 | — | — | — | — | —
4.7 | Health and safety conditions |
1.1.1
1.1.3
2.2.1
| — |
1.4.1
1.4.3
2.2.2
| —
The whole rail system, to which Directive (EU) 2016/797 applies and of which the energy subsystem is a part, is an integrated system whose consistency needs to be verified. This consistency must be checked, in particular, with regard to the specifications of the energy subsystem, its interfaces vis-à-vis the system in which it is integrated, as well as the operating and maintenance rules. The functional and technical specifications of the subsystem and its interfaces, described in points 4.2 and 4.3, do not impose the use of specific technologies or technical solutions, except where this is strictly necessary for the interoperability of the rail network.
Innovative solutions for interoperability, which do not fulfil requirements specified in this TSI and are not assessable as stated in this TSI, require new specifications and/or new assessment methods. In order to allow technological innovation, these specifications and assessment methods shall be developed by the process for innovative solutions described in points 6.1.3 and 6.2.3.
Taking account of all the applicable essential requirements, the energy subsystem is characterised by the specifications set out in points 4.2 to 4.7.
Procedures for the EC verification of the energy subsystem are indicated in point 6.2.4 and Appendix B, Table B.1, of this TSI.
For specific cases, see point 7.4.
Where reference is made to EN standards in this TSI, any variations called ‘national deviations’ or ‘special national conditions’ in the EN standards are not applicable and do not form part of this TSI.
The basic parameters characterising the energy subsystem are:
4.2.2.1. Traction power supply system:
Voltage and frequency (4.2.3);
Parameters relating to traction power supply system performance (4.2.4);
Current at standstill (4.2.5);
Regenerative braking (4.2.6);
Electrical protection coordination arrangements (4.2.7);
Harmonics and dynamic effects for AC traction power supply systems (4.2.8).
4.2.2.2. Geometry of the OCL and quality of current collection:
Geometry of the overhead contact line (4.2.9);
Pantograph gauge (4.2.10);
Mean contact force (4.2.11);
Dynamic behaviour and quality of current collection (4.2.12);
Pantograph spacing for overhead contact line design (4.2.13);
Contact wire material (4.2.14);
Phase separation sections (4.2.15);
System separation sections (4.2.16).
4.2.2.3. On-ground energy data collecting system (4.2.17)
4.2.2.4. Protective provisions against electric shock (4.2.18)
The nominal voltage and nominal frequency of the traction power supply system shall be one of the four systems:
AC 25 kV, 50 Hz;
AC 15 kV, 16,7 Hz;
DC 3 kV;
DC 1,5 kV.
For new lines with speed greater than 250 km/h, implementation rules are specified in point 7.1.1.
For newly built subsystems, or in the case the traction power supply system is changed (e.g. migration from DC to AC), the quality index for the subsystem shall comply with the specification referenced in Appendix E, Index [1] in order to enable trains to meet the design timetable.
The OCL shall be designed to sustain at least the values of current at standstill per pantograph, in accordance with the specification referenced in Appendix E, Index [2].
The traction power supply systems shall be designed to allow the use of regenerative braking according to the specification referenced in Appendix E, Index [1].
DC power supply systems shall be designed to permit the use of regenerative braking at least by exchanging power with other trains.
Electrical protection coordination design of the energy subsystem shall comply with the requirements detailed in the specification referenced in Appendix E, Index [1].
The interaction of traction power supply system and rolling stock can lead to electrical instabilities in the system.
In order to avoid instability and achieve electrical system compatibility, harmonic overvoltages shall be limited below critical values in accordance with the specification referenced in Appendix E, Index [1].
The overhead contact line shall be designed for pantographs with the head geometry specified in the LOC & PAS TSI, point 4.2.8.2.9.2 taking into account the rules set out in point 7.1.2 of this TSI.
The contact wire height and the lateral deviation of the contact wire under the action of a crosswind are factors which govern the interoperability of the rail network.
The permissible data for contact wire height is given in Table 4.2.9.1.
[Taking into account tolerances and uplift in accordance with the specification referenced in Appendix E, Index [3], the maximum contact wire height shall not be greater than 6500 mm.]
Description | v ≥ 250 [km/h] | v < 250 [km/h]
Nominal contact wire height [mm] | Between 5080 and 5300 | Between 5000 and 5750
Minimum design contact wire height [mm] | 5080 | In accordance with the specification referenced in Appendix E, Index [3] depending on the chosen gauge
Maximum design contact wire height [mm] | 5300 | 6200
For the relation between the contact wire heights and pantograph working heights see the specification referenced in Appendix E, Index [3].
At level crossings, the contact wire height shall be specified by national rules or in the absence of national rules, in accordance with the specification referenced in Appendix E, Index [4].
For the track gauge system 1520 and 1524 mm the values for contact wire height are as follows:
Nominal contact wire height: between 6000 mm and 6300 mm;
Minimum design contact wire height: 5550 mm;
Maximum design contact wire height: 6800 mm.
The maximum lateral deviation of the contact wire in relation to the track centre line under action of crosswind shall be in accordance with the specification referenced in Appendix E, Index [2].
[The values shall be adjusted taking into account the movement of the pantograph and track tolerances according to Appendix D.1.4.]
Pantograph length [mm] | Maximum lateral deviation [mm]
1600 | 400
1950 | 550
In the case of the multi-rail track, the requirement for lateral deviation shall be fulfilled for each pair of rails (designed, to be operated as a separated track) that is intended to be assessed against TSI.
Track gauge system 1520 mm:
For Member States applying the pantograph profile in accordance with point 4.2.8.2.9.2.3 of the LOC&PAS TSI the maximum lateral deviation of the contact wire in relation to the pantograph centre under action of a crosswind shall be 500 mm.
Track gauge system other than 1520 mm:
The mechanical kinematic pantograph gauge shall be specified using the method given in the specification referenced in Appendix E, Index [2] to this TSI and the pantograph profiles defined in LOC&PAS TSI, clauses 4.2.8.2.9.2.1 and 4.2.8.2.9.2.2.
Track gauge system 1520 mm:
For Member States applying the pantograph profile in accordance with LOC&PAS TSI, clause 4.2.8.2.9.2.3, the static gauge available for pantograph is defined in Appendix D to this TSI.
No part of the energy sub-system shall enter the pantograph gauge as stated in points (1) and (2), except for the contact wire and steady arm.
The mean contact force Fm is the statistical mean value of the contact force. Fm is formed by the static, dynamic and aerodynamic components of the pantograph contact force.
The ranges of Fm for each of the traction power supply systems are defined in the specification referenced in Appendix E, Index [2].
The overhead contact lines shall be designed to be capable to sustain the upper design limit of Fm given in the specification referenced in Appendix E, Index [2].
The curves apply to speed up to 360 km/h. For speeds above 360 km/h procedures set out in point 6.1.3 shall apply.
Depending on the assessment method, the overhead contact line shall achieve the values of dynamic performance and contact wire uplift (at the design speed) set out in Table 4.2.12.
Requirement | v ≥ 250 [km/h] | 250 > v > 160 [km/h] | v ≤ 160 [km/h]
Space for steady arm uplift | 2S0
Mean contact force Fm | See 4.2.11
Standard deviation at maximum line speed σmax [N] | 0,3Fm
Percentage of arcing at maximum line speed, NQ [%] (minimum duration of arc 5 ms) | ≤ 0,2 |
≤ 0,1 for AC systems
≤ 0,2 for DC systems
≤ 0,1
S0 is the simulated or measured uplift of the contact wire at a steady arm, with a minimum of two pantographs operating simultaneously with the upper limit of Fm at the OCL design speed. When the uplift of the steady arm is physically limited due to the overhead contact line design, it is permissible for the necessary space to be reduced to 1,5S0 (refer to the specification referenced in Appendix E, Index [3]).
Maximum force (Fmax) is usually within the range of Fm plus three standard deviations σmax; higher values may occur at particular locations and are given in the specification referenced in Appendix E, Index [3]. For rigid components such as section insulators in overhead contact line systems, the contact force can increase up to a maximum of 350 N.
The overhead contact line shall be designed for trains with two pantographs operating simultaneously. The design spacing of the two pantograph heads, centre line to centre line, shall be equal or lower than values set out in the specification referenced in Appendix E, Index [2].
The combination of contact wire material and contact strip material has a strong impact on the wear of contact strips and contact wire.
Permissible contact strip materials are defined in point 4.2.8.2.9.4.2 of LOC&PAS TSI.
Permissible materials for contact wires are copper and copper-alloy. The contact wire shall comply with the requirements of the specification referenced in Appendix E, Index [5].
The design of phase separation sections shall ensure that trains can move from one section to an adjacent one without bridging the two phases. Power exchange between the OCL and the unit shall be brought to zero, by switching off the on-board circuit breaker or other equivalent means, before entering the phase separation section. Adequate means (except for the short separation section) shall be provided to allow a train that is stopped within the phase separation section to be restarted.
The overall length D of neutral sections is defined in the specification referenced in Appendix E, Index [2]. For the calculation of D clearances, the specification referenced in Appendix E, Index [3] and an uplift of S0 shall be taken into account.
Two types of design of phase separation sections may be adopted:
a phase separation design where all the pantographs of the longest TSI compliant trains are within the neutral section. The overall length of the neutral section shall be at least 402 m.
For detailed requirements see the specification referenced in Appendix E, Index [2];
a shorter phase separation with three insulated overlaps as shown in the specification referenced in Appendix E, Index [2]. The overall length of the neutral section is less than 142 m including clearances and tolerances.
The design of separation sections shall normally adopt solutions as described in the specification referenced in Appendix E, Index [2]. Where an alternative solution is proposed, it shall be demonstrated that the alternative is at least as reliable.
The design of system separation sections shall ensure that trains can move from one traction power supply system to an adjacent different traction power supply system without bridging the two systems. There are two methods for traversing system separation sections:
with pantograph raised and touching the contact wire;
with pantograph lowered and not touching the contact wire.
The neighbouring Infrastructure Managers shall agree either (a) or (b) according to the prevailing circumstances.
The overall length D of neutral sections is defined in the specification referenced in Appendix E, Index [2]. For the calculation of D clearances, the specification referenced in Appendix E, Index [3] and an uplift of S0 shall be taken into account.
Power exchange between the OCL and the unit shall be brought to zero by switching off the on-board circuit breaker or other equivalent means, before entering the system separation section.
If system separation sections are traversed with pantographs raised to the contact wire, their functional design is specified as follows:
the geometry of different elements of the overhead contact line shall prevent pantographs short-circuiting or bridging both power systems;
provision shall be made in the energy subsystem to avoid bridging of both adjacent traction power supply systems should the opening of the on-board circuit breaker(s) fail;
variation in contact wire height along the entire separation section shall fulfil requirements set in the specification referenced in Appendix E, Index [3].
This option shall be chosen if the conditions of operation with pantographs raised cannot be met.
If a system separation section is traversed with pantographs lowered, it shall be designed so as to avoid the electrical connection of the two traction power supply systems by an unintentionally raised pantograph.
Point 4.2.8.2.8 of LOC & PAS TSI contains the requirements for on-board Energy Measurement Systems (EMS) intended to produce and transmit the Compiled Energy Billing Data (CEBD) to an on-ground energy data collecting system.
The on-ground energy Data Collecting System (DCS) shall receive, store and export CEBD without corrupting it, in accordance with the specification referenced in Appendix E, Index [6].
The on-ground energy DCS shall support all the data exchange requirements as defined in point 4.2.8.2.8.4 of the LOC&PAS TSI and requirements set out in the specification referenced in Appendix E, Index [7].
Electrical safety of the overhead contact line system and protection against electric shock shall be achieved by compliance with the specification referenced in Appendix E, Index [4] and, regarding AC voltage limits for the safety of persons and DC voltage limits, by compliance with the specification referenced in Appendix E, Index [4].
From the standpoint of technical compatibility, the interfaces are listed in subsystem order as follows: rolling stock, infrastructure, control — command and signalling, and operation and traffic management.
Reference in the ENE TSI | Reference in the LOC & PAS TSI
Parameter | Point | Parameter | Point
Voltage and frequency | 4.2.3 | Operation within range of voltages and frequencies | 4.2.8.2.2
Traction power supply performance | 4.2.4 |
Max current from OCL
Power factor
4.2.8.2.4
4.2.8.2.6
Current at standstill | 4.2.5 | Maximum current at standstill | 4.2.8.2.5
Regenerative braking | 4.2.6 | Regenerative brake with energy to OCL | 4.2.8.2.3
Electrical protection coordination arrangements | 4.2.7 | Electrical protection of the train | 4.2.8.2.10
Harmonics and dynamic effects for AC traction power supply systems | 4.2.8 | Harmonics and dynamic effects for AC systems | 4.2.8.2.7
Geometry of the overhead contact line | 4.2.9 |
Working range in height of pantograph
Pantograph head geometry
4.2.8.2.9.1
4.2.8.2.9.2
Pantograph gauge |
4.2.10
Appendix D
Pantograph head geometry
Gauging
4.2.8.2.9.2
4.2.3.1
Mean contact force | 4.2.11 | Pantograph static contact force | 4.2.8.2.9.5
Pantograph contact force and dynamic behaviour | 4.2.8.2.9.6