Table 1 of Appendix 9 of Annex I to Regulation (EU) No 582/2011 is replaced by the following:
[“NOx OTL” monitoring requirements as set out in Table 1 and 2 of Annex X.] [“PM OTL” monitoring requirements as set out in Table 1 of Annex X.] [“Performance monitoring” requirements as set out in point 2.1.1 of Annex X.] [Reagent quality and consumption “phase-in” requirements as set out in points 7.1.1.1 and 8.4.1.1 of Annex XIII.] [Reagent quality and consumption “general” requirements as set out in points 7.1.1 and 8.4.1 of Annex XIII.] [“CO OTL” monitoring requirements as set out in Table 2 of Annex X.] [IUPR “Phase-in” requirements as set out in points 6.4.4, 6.5.5 and 6.5.5.1 of Annex X.] [IUPR “General” requirements as set out in Section 6 of Annex X.] [For positive-ignition engines and vehicles equipped with such engines.] [For compression-ignition engines and vehicles equipped with such engines.] [Only applicable to positive-ignition engines and vehicles equipped with such engines.’]
Character | NOx OTL | PM OTL | CO OTL | IUPR | Reagent quality and consumption | Implementation dates: new types | Implementation dates: all vehicles | Last date of registration
A | Row “phase-in period” of Table 1 or Table 2 | Performance monitoring | | Phase-in | Phase in | 31.12.2012 | 31.12.2013 |
31.8.2015
30.12.2016
B | Row “phase-in period” of Table 2 | | Row “phase-in period” of Table 2 | Phase-in | Phase in | 1.9.2014 | 1.9.2015 | 30.12.2016
C | Row “general requirements” of Table 1 or Table 2 | Row “general requirements” of Table 1 | Row “general requirements” of Table 2 | General | General | 31.12.2015 | 31.12.2016 |