Art. 3 Regulation (EC) No 1013/2006 of the European Parliament and of the Council of 14 June 20…

Overall procedural framework

In forcesince 8 Mar 2012cited 36×
1.

Shipments of the following wastes shall be subject to the procedure of prior written notification and consent as laid down in the provisions of this Title:

(a)

if destined for disposal operations:

all wastes;

(b)

if destined for recovery operations:

(i)

wastes listed in Annex IV, which include, inter alia, wastes listed in Annexes II and VIII to the Basel Convention,

(ii)

wastes listed in Annex IVA,

(iii)

wastes not classified under one single entry in either Annex III, IIIB, IV or IVA,

(iv)

mixtures of wastes not classified under one single entry in either Annex III, IIIB, IV or IVA unless listed in Annex IIIA.

2.

Shipments of the following wastes destined for recovery shall be subject to the general information requirements laid down in Article 18, if the amount of waste shipped exceeds 20 kg:

(a)

waste listed in Annex III or IIIB;

(b)

mixtures, not classified under one single entry in Annex III, of two or more wastes listed in Annex III, provided that the composition of these mixtures does not impair their environmentally sound recovery and provided that such mixtures are listed in Annex IIIA, in accordance with Article 58.

3.

For wastes listed in Annex III, in exceptional cases, the relevant provisions shall apply as if they had been listed in Annex IV, if they display any of the hazardous characteristics listed in Annex III to Directive 91/689/EEC. These cases shall be treated in accordance with Article 58.

4.

Shipments of waste explicitly destined for laboratory analysis to assess either its physical or chemical characteristics or to determine its suitability for recovery or disposal operations shall not be subject to the procedure of prior written notification and consent as described in paragraph 1. Instead, the procedural requirements of Article 18 shall apply. The amount of such waste exempted when explicitly destined for laboratory analysis shall be determined by the minimum quantity reasonably needed to adequately perform the analysis in each particular case, and shall not exceed 25 kg.

5.

Shipments of mixed municipal waste (waste entry 20 03 01) collected from private households, including where such collection also covers such waste from other producers, to recovery or disposal facilities shall, in accordance with this Regulation, be subject to the same provisions as shipments of waste destined for disposal.

The 10 that are cited most themselves, of 36.

  • Judgment of the Court (Fifth Chamber), 12 December 2013. Ragn-Sells AS v Sillamäe Linnavalitsus.Decision

    Title II of that regulation, covering shipments within the European Union, comprises Articles 3 to 32 thereof, Article 3 of which provides: ‘1. Shipments of the following wastes shall be subject to the procedure of prior written …

    12 Dec 2013 · 62012CJ0292

  • Judgment of the Court (Grand Chamber) of 8 September 2009. Commission of the European Communities v European Parliament and Council of the EDecision

    Title II of the contested regulation, which comprises Articles 3 to 32 thereof, concerns shipments of waste within the Community with or without transit through third countries. That title provides for the basic scheme under that …

    8 Sep 2009 · 62006CJ0411

  • Judgment of the Court (Seventh Chamber) of 26 November 2015. SC Total Waste Recycling SRL v Országos Környezetvédelmi és Természetvédelmi FőDecision

    Article 3(1)(b)(i) of Regulation No 1013/2006 provides that shipments of wastes destined for recovery operations and included in the ‘amber’ list of waste in Annex IV to that regulation are to be subject to the procedure of prior …

    26 Nov 2015 · 62014CJ0487

  • Judgment of the Court (Fourth Chamber) of 9 June 2016. Nutrivet D.O.O.E.L. v Országos Környezetvédelmi és Természetvédelmi Főfelügyelőség.Decision

    Article 3 of Regulation No 1013/2006, headed ‘Overall procedural framework’, provides as follows in (2): ‘Shipments of the following wastes destined for recovery shall be subject to the general information requirements laid down in …

    9 Jun 2016 · 62015CJ0069

  • Judgment of the Court (Grand Chamber) of 21 January 2025. Land Niedersachsen v Conti 11. Container Schiffahrts-GmbH & Co. KG MS 'MSC FlaminiDecision

    Article 3(1) of the same regulation, which appears in Title II thereof, entitled ‘Shipments within the Community with or without transit through third countries’, provides: ‘Shipments of the following wastes shall be subject to the …

    21 Jan 2025 · 62023CJ0188

  • Judgment of the Court (Fifth Chamber) of 28 May 2020. Interseroh Dienstleistungs GmbH v SAA Sonderabfallagentur Baden-Württemberg GmbH.Decisioninterprets

    This request for a preliminary ruling concerns the interpretation of Article 3(2) of Regulation (EC) No 1013/2006 of the European Parliament and of the Council of 14 June 2006 on shipments of waste (OJ 2006 L 190, p. 1), as amended by …

    28 May 2020 · 62018CJ0654

  • Opinion of Advocate General Saugmandsgaard Øe delivered on 24 January 2019. ReFood GmbH & Co. KG v Landwirtschaftskammer Niedersachsen.Decision

    Following that inspection, the Landwirtschaftskammer Niedersachsen (the Chamber of Agriculture of Lower Saxony, Germany), defendant in the main proceedings, instructed ReFood to return the waste to the Netherlands on the ground that a …

    24 Jan 2019 · 62017CC0634

  • AbfVerbrG25Law

    … der Europäischen Union Vorrang vor der Beseitigung in einem anderen Staat. (2) Absatz 1 gilt in Ausführung von Artikel 3 Abs. 5 der Verordnung (EG) Nr. 1013/2006 entsprechend für gemischte Siedlungsabfälle (Abfallschlüssel 20 03 01), …

  • Judgment of the Court (First Chamber) of 23 October 2025. Naturvårdsverket v UQ and IC.Decision

    Art. 3 der Verordnung Nr. 1013/2006 legt den „[a]llgemeine[n] Verfahrensrahmen“ für diese Verbringungen fest und sieht u. a. ein Verfahren für ihre Notifizierung vor, wobei der Geltungsbereich der Notifizierung in Art. 4 Abs. 2 Nr. 6 …

    23 Oct 2025 · 62024CJ0221

  • Judgment of the Court (Eighth Chamber) of 11 November 2021. Regione Veneto v Plan Eco Srl.Decisioninterprets

    Z těchto důvodů Soudní dvůr (osmý senát) rozhodl takto: Článek 3 odst. 5 a článek 11 nařízení Evropského parlamentu a Rady (ES) č. 1013/2006 ze dne 14. června 2006 o přepravě odpadů musí být vykládány v tom smyslu, …

    11 Nov 2021 · 62020CJ0315